Phase I Archaeological Survey of the Proposed Lula Telecommunications Facility in Lula Banks County, Georgia

Author(s)
Report Number
10045
Year of Publication
2015
County
Abstract

A Phase I archaeological survey was performed on August 29, 2015 of the proposed lease area, access/utility easement, and three proposed guy wire easements (hereafter also called survey area) of the Lula telecommunication facility located in Lula, Georgia (34º 22’ 46.05” N, 83º 39’ 09.76” W). The survey area is located on the Lula, GA USGS quad. The study was conducted for Terracon Consultants, Inc., on behalf of SouthernLINC Wireless, in order to locate and identify archaeological resources and to assess resource significance based on National Register of Historic Places (NRHP) criteria [36CFR Part 60.4 (a-d)]. This survey was conducted to comply with the provisions of the Federal Communications Commission (FCC) permitting under the Nationwide Programmatic Agreement (47 CFR Part 1). In accordance with the permitting process, the survey was conducted in compliance with Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended. The Phase I survey included a literature review and intensive field survey. During the literature review, which took place on August 7, 2015, state and county maps and documents were examined to determine if previously recorded archaeological resources were located in or around the survey area. The field survey was conducted using surface and subsurface techniques (i.e., visual inspection and shovel testing) to locate and identify archaeological resources within the study area. Literature Review: Review of the Georgia Archaeological Site File (GASF) revealed that there are no previously recorded archaeological sites or surveys within .8 km (.5 mi) of the survey area.

Archaeological Resources Field Survey: There are no archaeological materials (i.e., culturally modified artifacts,

cultural deposits, features, or human remains) located within the survey area.

Recommendations: This study recommends that the current proposed project receive archaeological resource

clearance; no further archaeological work is recommended.