Abstract

Archeological Assessment of a Multiple District Intersection Improvement Project. This project involves the installation of LED countdown pedestrian signal heads at several intersections in Districts 2, 6 and 7. The installation will be the replacement of the old heads. The only proposed ground disturbance will be the installation of Type B, curb cut, wheelchair ramps at three locations in District 7. All work will take place within the existing right-of-way, no new right-of-way is required. Below is the list of locations by District.