Archaeological Assessment of Project MLP-12 (51), Morgan County

Report Number
6912
Year of Publication
2002
Abstract

The following is being furnished to you for inclusion as written, in the appropriate environmental document: "In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project MLP-12(51), Morgan County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP). The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect. Project MLP-12(51) involves the addition of a sidewalk adjacent to SR 24/US 441 (South Main Street) in the city of Madison. The project would begin at the end of the existing sidewalk and would continue south for a distance of approximately 152.4 m (500 ft). All work would be limited to the existing right-of-way. An archaeological survey consistent with the proposed rights-of-way was conducted for the entire length of both project corridors. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.