Back to top

Hise, Alana

Report Number Author(s) Title Abstract Summary County Year
7869 Hise, Alana, Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed SR 140 Widening from East Cherokee Drive to I-575, Cherokee County, Georgia

On November 19 and 20, 2008, and February 4, 2009, Edwards-Pitman Environmental, Inc . (EPEI) conducted a Phase I archaeological survey of the proposed widening of State Route (SR) 140 from East Cherokee Drive to Interstate (I) 575, Cherokee County, Georgia.

Crisp 2007
7988 Hise, Alana, Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Intersection Improvements at State Route 247 and County Route 189/Walker Road, Peach County, Georgia

On March 11, 2009, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological investigation of the proposed intersection improvements at State Route (SR) 24 7 at County Route (CR) 189/Walker Road in Peach County, Georgia.

Greene 1999
7991 Silliman, Garrett W., Hise, Alana Archaeological Survey of I-20 Eastbound Improvements from Columbia Drive to Panola Road, DeKalb County, Georgia

Project Description: The proposed project consists of an operational improvement on I-20 Eastbound in DeKalb County in the vicinity of the I-20/I-285 interchange, from approximately the I-20/Columbia Drive interchange to the I-20/Panola Road interchange, for a total distance of approximately 4.5

Fulton 2013
8012 Silliman, Garrett W., Hise, Alana Second Addendum to I-85 at Lawrenceville-Suwanee Road Lands and Sidewalk Project, Gwinnett County, Georgia

Original: The proposed project would construct sidewalks the along the west side of LawrencevilleSuwanee Road from Satellite Boulevard. to Old Peachtree Road. The project would also construct pedestrian facilities along both sides of the roadway.

Rabun 1990
8027 Silliman, Garrett W., Hise, Alana Phase I Archaeological Survey of Proposed Safety Improvements to SR 42/US 23 in Henry County, Georgia

The proposed project is located at the intersections of SR 42/US 23 with CR 648/Locust Grove Griffin Road and with CR 328/Roberts Road/Grove Road in Locust Grove, Henry County, Georgia.

Pickens 0
8055 Silliman, Garrett W., Hise, Alana Addendum to the Phase I Archaeological Survey of SR 136 over West Chickamauga Creek

Original: The project is located on SR 136 at the crossing of West Chickamauga Creek in Walker County, Georgia. The proposed project would replace the existing two-lane bridge with a slightly longer concrete bridge structure that is approximately 40-foot wide.

Jasper 2014
8497 Silliman, Garrett W., Hise, Alana Ph. I Arch. Survey of the Proposed SR 96 Lighting & Landscaping for City of the Reynolds

The proposed project would consist of streetscape improvements on SR 96 in downtown Reynolds, Georgia. The project proposes to add landscaping and entrance features at the city limits to the west at Suggs Mill Pond Road and to the east at South General John B. Gordon Road.

Effingham 2015
8526 Silliman, Garrett W., Hise, Alana Addendum to the Phase I Archaeological Survey of the SR 32 over the Flint River Bridge Replacement, Lee and Worth Counties

During August 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed improvements to the State Route (SR) 32 bridge over the Flint River in Worth and Lee counties.

Chatham 2014
9175 Pietak, Lynn Marie, Hise, Alana Phase I Archaeological Survey of Intersection Improvements at SR 61 and South Carroll Road

The project is located in the city of Villa Rica about one half mile south of Interstate 20 in a developing urban area consisting of commercial and residential establishments. The length of this project is approximately 0.40 miles from mile post 7.77 to 8.17 and is located in Carroll County.

Forsyth 2002
9187 Pietak, Lynn Marie, Hise, Alana Phase I Archaeological Survey of Intersection Improvements at SR 78/ US 23 and SR 18/ Dames Ferry Road, Monroe County, Georgia

The project is located in Monroe County, Georgia, approximately ten miles east of the city of Forsyth. The proposed project would consist of construction of a roundabout at the intersection of SR 87/US 23 and SR 18.

Monroe 2009
Displaying 11 - 20 of 21