Back to top

Thomas, Brian W.

Report Number Author(s) Title Abstract Summary County Year
1932 Thomas, Brian W. Cultural Resource Survey for the Weaver-Youngcane Transmission Line Union County

A cultural resources survey, consisting of both archaeological and architectural assessments, was accomplished for the proposed Weaver-Youngcane Transmission Line in Union County, Georgia.

Union County, GA 1999
1934 Thomas, Brian W. Phase I Archaeological Survey for the Rockdale County Water Treatment Plant Rockdale County

TRC Garrow Associates, Inc.

Rockdale County, GA 2000
2517 Thomas, Brian W. Cultural Resources Survey of the 1.2 Mile Yahoola Creek Trail, Lumpkin County, Georgia

None Present.

Lumpkin County, GA 2003
2620 Thomas, Brian W. Phase I Archeological Survey for the City of Atlanta's Southtowne Trail, Fulton County, Georgia

In October 2003, TRC conducted an archaeological survey of the proposed 2-mile Southtowne Trail in Fulton County, Georgia.

Fulton County, GA 2003
2722 Thomas, Brian W., Carr, Jeffrey T. Archaeological Survey for the Proposed Bells Ferry Road Widening Project, Cherokee County, Georgia

TRC was contracted by Delon Hampton and Associates to carry out a Phase I archaeological survey for the proposed Bells Ferry Road widening project in Cherokee County, Georgia.

Cherokee County, GA 2004
3772 Thomas, Brian W. Addendum Report for Archaeological Survey for the Proposed Bells Ferry Road Widening Project, Cherokee County, Georgia

Addendum Report for Archaeological Survey for the Proposed Bells Ferry Road Widening Project, Cherokee County, Georgia, GDOT; HPD Tracking # HP040.

Cherokee County, GA 2006
4155 Thomas, Brian W. Cultural Resource Survey for the Proposed Basin-Toccoa 116kV Transmission Line, Polk County, Tennessee, & Fannin County, Georgia

In April and May, 2000, TRC Garrow Associates, Inc., conducted a cultural resources survey of the proposed TVA Basin-Toccoa 161-kV transmission line and Toccoa 161-kV substation.

Fannin County, GA 2000
4156 Thomas, Brian W. Cultural Resources Survey for the Proposed Center Point Substation, Whitfield County, Georgia

In March 2000, TRC Garrow Associates, Inc. (TRC), conducted a cultural resources survey for the proposed Center Point Substation and access road for the Tennessee Valley Authority.

Whitfield County, GA 2000
4183 Thomas, Brian W. Lake Tugalo Water Treatment Plant at Black Branch

In April 1999 TRC Garrow Associates, Inc. (TRC), completed a Phase I cultural resources survey consisting of both archaeological and architectural assessments of a proposed plant site, pond site, and a pipeline corridor.

Habersham County, GA 1999
6650 Thomas, Brian W. Cultural Resources Survey for the Proposed Glennville Wastewater Treatment Plant, Tattnall County, Georgia

In April 1999, TRC Garrow Associates, Inc. (TRC), conducted a Phase I cultural resources survey of a 225-acre tract in Tattnall County, Georgia. The tract contains the proposed site of a wastewater treatment facility and construction wetlands.

Gwinnett County, GA 1995
Displaying 1 - 10 of 12