Back to top

Rotenstein, David S.

Report Number Author(s) Title Abstract Summary County Year
11312 Rotenstein, David S. Archaeological Assessment of Project BRZLB-147(5), Hart County

10+93 (38') DBL + DBL 10' x 10' Concrete Bridge Culvert. 60' - ·so' required right of way with easements for construction of channel. Roadway to be closed during construction.

Hart 1986
11315 Rotenstein, David S. Archaeological Assessment of Project BRZLB-147(6), Hart County

Sta. 17+01. 39 to Sta. 17+22. 61 Double 9'x9 ' Concrete Box Culvert (46'). R/W of 80'-0" will be required with easements f or construct ion of channel. Roadway to be closed during construction.

Hart 1986
11318 Rotenstein, David S. Archaeological Assessment of Project BRZLB-19(5), Berrien County

A proposed 8‘ x 24’ concrete bridge to be constructed on existing alignment. Approximately 80’ of additional right of way will be needed. This road will be closed during construction. 

Berrien 1986
11319 Rotenstein, David S. Archaeological Assessment of Project BRZLB-039(3), Camden County

Bridge and approaches, 34’ wide concrete bridge. 80’ right of way existing, road to be closed and traffic detoured on other roads.

Camden 1985
11325 Rotenstein, David S. Bridge Review Sheet: BHS-1819(5), Burke County

This is a bridge project, BHS-1819(5), Burke County. The bridge is on SR 56 Spur and is over Boggy Gut Creek. The existing structure is a 90 foot long by 24 feet wide steel and concrete bridge. The existing ROW is 80 to 150 feet.

Burke 1985
11340 Rotenstein, David S. Archaeological Assessment of Project BRZLB-151(5), Henry County

32’ x 19.5’ timber bridge. Bridge on Laney Road over unnamed creek.

Henry 1986
11341 Rotenstein, David S. Archaeological Assessment of Project BRS-0777(9), Jasper County

Bridge on SR 212 over North Fork Wolf Creek. No Wetland involvement, no historic materials, no displacements, no public water intakes, no significant archaeological material.

Jasper 1986
11344 Rotenstein, David S. Archaeological Assessment of Project BHS-0916(3), Jackson County

312' x 21 .8' Existing Steel and Concrete Bridge. 100' Existing Right of Way Total. Sta. 666+89.90 to Sta. 687+00.00 - 0.381 Mi. Retain & widen existing bridge symmetrically to 40 ft. No additional R/W required. No detour required. Use stage construction.

Jackson 1986
11345 Rotenstein, David S. Archaeological Assessment of Project BRZLB-157(5), Jackson County

15' X 45' Wood bridge with existing R/W at edge of existing roadway. Sta. 20+15, 47' Triple 9' X 8' Concrete Bridge Culvert. Var. 6~' to 110' total R/W will be required with easements required for channel construction.

Jackson 1986
11346 Rotenstein, David S. Archaeological Assessment of Project BRF-026-3(35), Liberty County

.5 miles; no detour; widen bridge approaches to 24’ and construct 44’ wide bridge.

Liberty 1985
Displaying 121 - 130 of 244