Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
2856 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Reassessment of Project MLP-87(45), Dodge County

None Present.

Dodge 2004
2872 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-0003-00(623), Peach County

None Present.

Peach 2004
2878 Duff, Eric Anthony Phase I Archaeological Survey of Ten Traffic Signal Design Areas in Douglas County, Georgia

None Present.

Douglas 2004
2940 Duff, Eric Anthony, Joseph, Joseph W. Addendum to the Phase I Archaeological Survey of Sixteen Intersections, Forsyth County, Georgia

The study consists of a review of right-of-way changes at 15 intersections previously surveyed during the 2000 Phase I survey of 16 intersection improvement areas in Forsyth County.

Forsyth 2004
2966 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSNHS-0006-00(688), Fulton County

The proposed project would consist of the widening of approximately 1800 feet of the viaduct located on Interstate 85/SR 403 North to accommodate a 300 foot taper and a 1500 foot auxiliary lane. Total project length is approximately 2500 feet.

Fulton 2005
2999 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(236), Coweta and Fayette Counties

The proposed project would consist of upgrading traffic signals at various locations along SR 34 and SR 54. All proposed work would be done within existing right-of-way.

Coweta 2005
3000 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(112), Fulton County

The proposed project would consist of upgrading traffic signals at various locations along SR 9 from Bethany Road to SR 120. All proposed work would be done within existing right-of-way.

Fulton 2005
3001 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(111), Fulton and Cobb Counties

The proposed project would consist of upgrading traffic signals at various locations along SR 120/Roswell Road from Timber Ridge to just past Coleman Road. All proposed work would be done within existing right-of-way.

Fulton 2005
3002 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CSSTP-0007-00(113), Fulton and DeKalb Counties

The proposed project would consist of upgrading traffic signals at various locations along SR 42/North Druid Hills Road and SR 42/Briarcliff Road. All proposed work would be done within existing right-of-way.

Fulton 2005
3016 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CCSTP-0007-00(069), Douglas County

The proposed project would improve the intersection of SR 5/Bill Arp Road with CR 192Bright Star Road. SR 5/Bill Arp Road will be symmetrically widened about the centerline to provide an approximately 200' left turn lane and also a right turn lane.

Douglas 2005
Displaying 41 - 50 of 695