2856
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project MLP-87(45), Dodge County
|
None Present.
|
Dodge
|
2004
|
2872
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-0003-00(623), Peach County
|
None Present.
|
Peach
|
2004
|
2878
|
Duff, Eric Anthony
|
Phase I Archaeological Survey of Ten Traffic Signal Design Areas in Douglas County, Georgia
|
None Present.
|
Douglas
|
2004
|
2940
|
Duff, Eric Anthony, Joseph, Joseph W.
|
Addendum to the Phase I Archaeological Survey of Sixteen Intersections, Forsyth County, Georgia
|
The study consists of a review of right-of-way changes at 15 intersections previously surveyed during the 2000 Phase I survey of 16 intersection improvement areas in Forsyth County.
|
Forsyth
|
2004
|
2966
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CSNHS-0006-00(688), Fulton County
|
The proposed project would consist of the widening of approximately 1800 feet of the viaduct located on Interstate 85/SR 403 North to accommodate a 300 foot taper and a 1500 foot auxiliary lane. Total project length is approximately 2500 feet.
|
Fulton
|
2005
|
2999
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CSSTP-0007-00(236), Coweta and Fayette Counties
|
The proposed project would consist of upgrading traffic signals at various locations along SR 34 and SR 54. All proposed work would be done within existing right-of-way.
|
Coweta
|
2005
|
3000
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CSSTP-0007-00(112), Fulton County
|
The proposed project would consist of upgrading traffic signals at various locations along SR 9 from Bethany Road to SR 120. All proposed work would be done within existing right-of-way.
|
Fulton
|
2005
|
3001
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CSSTP-0007-00(111), Fulton and Cobb Counties
|
The proposed project would consist of upgrading traffic signals at various locations along SR 120/Roswell Road from Timber Ridge to just past Coleman Road. All proposed work would be done within existing right-of-way.
|
Fulton
|
2005
|
3002
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CSSTP-0007-00(113), Fulton and DeKalb Counties
|
The proposed project would consist of upgrading traffic signals at various locations along SR 42/North Druid Hills Road and SR 42/Briarcliff Road. All proposed work would be done within existing right-of-way.
|
Fulton
|
2005
|
3016
|
Duff, Eric Anthony, McIntosh, Paul
|
Archaeological Assessment of Project CCSTP-0007-00(069), Douglas County
|
The proposed project would improve the intersection of SR 5/Bill Arp Road with CR 192Bright Star Road. SR 5/Bill Arp Road will be symmetrically widened about the centerline to provide an approximately 200' left turn lane and also a right turn lane.
|
Douglas
|
2005
|