10505 |
Duff, Eric Anthony |
Archaeological Reassessment of Project STP-115-1(9), White County |
"In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-115-1 (9), White County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH |
White County, GA |
1999 |
10506 |
Duff, Eric Anthony, Lotti, Teresa Ann |
Archaeological Assessment of Project PR-133-4(221), Oglethorpe County |
Archaeological Assessment of Project PR-133-4(221), Oglethorpe County, grading, draining, and surfacing of CR 133. The entire length of the project is 0.95 mile. The existing right-of-way is 80 feet. No additional right-of-way will be required. |
Oglethorpe County, GA |
2001 |
10508 |
Duff, Eric Anthony |
Archaeological Assessment of a District 7 Resurfacing Project, Douglas County |
The proposed project would consist of the milling, resurfacing, and striping on SR 5 in Douglas County, Georgia. The proposed project would begin on SR 5 at SR 402 (1-20) and continue northerly/easterly to an end point at SR 6 (generally MP 12.93 to MP 23.58). |
Douglas County, GA |
2007 |
10519 |
Duff, Eric Anthony |
Archaeological Assessment of Bartow and Carroll County Resurfacing Improvement Projects |
Archaeological Assessment of Bartow and Carroll County Resurfacing Improvement Projects. The proposed projects consist of the resurfacing and rehabilitation of earth shoulders on SR 61 in Bartow and Carroll County. |
Bartow County, GA |
2007 |
10520 |
Duff, Eric Anthony |
Archaeological Assessment of a District 7 Resurfacing Project, Dekalb County |
The proposed project would consist of the milling, resurfacing, and striping on SR 42 in DeKalb County, Georgia. The proposed project would begin on SR 42 at Caroline Street and continue northerly to an end point at Buford Highway (generally MP 7.90 to MP 13.87). |
DeKalb County, GA |
2007 |
10521 |
Duff, Eric Anthony |
Archaeological Assessment of a Johnson/Washington County Resurfacing Project |
The proposed project consists of resurfacing, milling, leveling, and shoulder building on SR 57 beginning at the Washington/Wilkinson County Line (Balls Ferry Bridge or MP 0.00) in Washington County and ending at SR 15 (MP 11 .80) in Johnson County. |
Johnson County, GA |
2007 |
10522 |
Duff, Eric Anthony |
Archaeological Assessment of an Appling County Resurfacing Project |
The proposed project would include resurfacing, shoulder rehabilitation, and striping on SR 15 in Appling County. The proposed project would begin on SR 15 approximately 1568 feet south of Bryant Boyette Road then continue northerly to an end point at SR 4 (generally from MP 0.70 to MP 20.03). |
Appling County, GA |
2007 |
10524 |
Duff, Eric Anthony |
Project-SR 316 Corridor Improvements, Oconee County: Archaeological Resources Survey |
The subject project consists of the proposed interchange reconstruction and ramp construction in the northern quadrant of the Athens Bypass/SR 316 and Epps Bridge Road Interchange in Oconee County. |
Oconee County, GA |
1996 |
10526 |
Duff, Eric Anthony |
Archaeological Assessment of a District 1 Resurfacing Project, Oconee County |
The proposed project would consist of the milling, leveling, resurfacing, shoulder building, shoulder paving, and placement of pavement markings on SR 15 in Oconee County, Georgia. |
Oconee County, GA |
2007 |
10527 |
Duff, Eric Anthony |
Archaeological Assessment of Project BRF-114-1(93), White County |
The proposed project would replace the narrow and structurally deficient bridge on SR 115 over the Chattahoochee River in White County. |
White County, GA |
1996 |