11495
|
Duff, Eric Anthony
|
Archaeological Assessment of a Laurens County Resurfacing Project (CSSTP-M003-00(670))
|
The proposed project consists of resurfacing, leveling, shoulder paving and shoulder building on SR 338 beginning at SR 117 and ending at SR 257. All construction related activity will take place within the existing right-of-way.
|
Laurens
|
2007
|
11528
|
Duff, Eric Anthony
|
Archaeological Assessment of Ten Ware County Railroad Grade Crossing Improvement Projects
|
The proposed project would improve 10 existing railroad grade crossings in Ware County, Georgia by installing train activated warning devices (bells, lights, and gates). All work will take place within the existing right-of-way; no new right-of-way or easements will be required.
|
Ware
|
2007
|
11602
|
Duff, Eric Anthony
|
Archaeological Assessment of a Fulton County Resurfacing Project, CSSTP-M003-00(753)
|
The proposed project would include resurfacing, milling, shoulder building, and striping on SR 8 in Fulton County. The proposed project would begin on SR 8 at the Fulton/Cobb County line then continue southeasterly to an end point at SR 3 (generally from MP 0.00 to MP 6.41).
|
Fulton
|
2007
|
11608
|
Duff, Eric Anthony
|
Archaeological Assessment of Project IM-285-1(348), Dekalb County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project IM- 285-1(348), Dekalb County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH
|
DeKalb
|
1996
|
11612
|
McIntosh, Paul, Duff, Eric Anthony
|
Archaeological Assessment of Project IM-00MS(332), Carroll and Haralson Counties
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, projects IM-OOMS (332), Carroll/Haralson Counties, has been surveyed with respect to.
|
Carroll
|
1999
|
11646
|
Duff, Eric Anthony
|
Bridge Categorical Exclusion, BRZLB-155(3) Irwin County
|
This is a bridge project, BRZLB-155(3), located in Irwin County. The bridge is on CR 181 and crosses Willacoochee River. The existing bridge is 56.1 meters long and 7.3 meters wide. It has steel pilings, concrete caps, concrete deck, and metal railing. The existing ROW is 24.4 meters.
|
Irwin
|
1995
|
11650
|
Duff, Eric Anthony
|
Archaeological Assessment of a District 1 Maintenance Improvement Project, CSSTP-M003-00(789)
|
The proposed project would consist of resurfacing, milling, and shoulder building on SR 254 in Hall and White Counties, Georgia.
|
Hall
|
2008
|
11651
|
Duff, Eric Anthony
|
Archaeological Assessment of a Houston and Peach County Resurfacing Project
|
The proposed project would include resurfacing, shoulder building, leveling, milling, and patching on SR 247 Connector in Houston/Peach Counties.
|
Peach
|
2007
|
11652
|
Duff, Eric Anthony
|
Archaeological Assessment of a District 1 Resurfacing Project, CSSTP-M003-00(760)
|
The proposed project would consist of the milling, overlay, resurfacing, leveling, patching, and shoulder building on SR 60 in Union County, Georgia.
|
Union
|
2007
|
11711
|
Lotti, Teresa Ann, Duff, Eric Anthony
|
Archaeological Assessment of Project STP-M001-00(271), Treutlen and Laurens Counties
|
Archaeological Assessment of Project STP-MOOI-00(271), Treutlen and Laurens Counties, paving one foot of existing shoulder on each side of a portion of SR199 in Laurens County, as well as leveling and resurfacing a portion SR 199 beginning at the Montgomery/Treutlen County Line and ending at mile
|
Treutlen
|
2002
|