Report Number Author(s) Title Abstract Summary County Year
4666 Schoeneberg, Erica Archaeological Assessment of Project BRZLB-009(5), Baldwin County

Proposed project BRZLB-009(5) in Baldwin County replace the narrow and structurally deficient bridge on CR 72/Pettigrew Road over Fishing Creek, approximately 6.0 miles west of Milledgeville.

Baldwin County, GA 1999
4922 Schoeneberg, Erica Archaeological Reassessment of Project PRLOP-037(079), Crawford County

Project PRLOP-37(079), Crawford County, proposes make improvements (grading, drainage, base and paving) to CR 37 (Cool Springs Road) and CR 53.

Crawford County, GA 1998
4990 Schoeneberg, Erica Archaeological Reassessment of Project BRMLB-5108(5), Houston

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Houston County, GA 2000
5336 Schoeneberg, Erica Archaeological Assessment of Project BR-STP-2837(3), Washington County

One archaeological site, 9WG(DOT)19, a low density lithic and ceramic artifact scatter, was found within the project APE, but it is recommended as ineligible to the NRHP. No existing or eligible National Register resources were located within the project's area of potential environmental effect.

Washington County, GA 1999
5483 Schoeneberg, Erica Archaeological Assessment of Project STP-9327(2), Dekalb County

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Walker County, GA 1982
5722 Schoeneberg, Erica Archaeological Assessment of Project HPP-STP-9124(11), Fulton/Dekalb Counties

An archaeological survey (Level 2) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic P

Clarke County, GA 2009
5723 Schoeneberg, Erica Archaeological Reassessment of Project NH-168-1(20), Fulton/Clayton Counties

An archaeological survey (Level 2) for the SR 138 and Oakley Industrial Boulevard intersection improvements was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Division Staff an

Hall County, GA 2009
6450 Schoeneberg, Erica Archaeological Assessment of Project IM-00MS(370), Gwinnett County

Proposed project IM-OOMS(370) in Gwinnett County proposes to make improvements to the 1-85 and SR 317 interchange. The 1-85 ramp improvements would begin approximately 2274 feet south, of SR 317 and end at a point approximately 2477 feet north of SR 317.

Glynn County, GA 1995
6451 Schoeneberg, Erica Archaeological Assessment of Project IM-OOMS(371), Gwinnett County

Project IM-OOMS(371) in Gwinnett County proposes to reconstruct and rehabilitate the existing ramps and shoulders of the 1-85 and CR 134/Hamilton Mill Road interchange with concrete pavement.

Glynn County, GA 1996
6460 Schoeneberg, Erica Archaeological Assessment of Project STP-05478(6), Emanuel/Johnson/Jefferson Counties

Project STP-0578(6), Emanuel/Johnson/Jefferson Counties, proposes to add 0.61 m (2 ft.) asphalt shoulders to each side of State Route 171.

Glynn County, GA 2001