14364
|
Quirk, Phillip W., Silliman, Garrett W.
|
Addendum Phase I Archaeological Survey of the Proposed Clark Avenue Extension from SR 91/Jefferson Street to SR 3/Liberty Expressway and Phase II Evaluative Testing for Sites 9DU149 and 9DU189, Dougherty County, Georgia
|
During March and April 2011, Edwards-Pitman Environmental, Inc.
|
Dougherty
|
2014
|
12140
|
Pietak, Lynn Marie, Silliman, Garrett W.
|
Phase I Archaeological Survey of Gateway Bridge and Approach Path Locations, Peachtree City, Fayette County, Georgia, STP-0004-00(483)
|
The proposed project would involve the construction of a steel bridge with a minimum clear-span width of 12 feet that would extend from the south side of SR 54 to the north side of SR 54, a two-lane highway which is currently being widened into 4 lanes. The existing r/w is 200 ft.
|
Fayette
|
2006
|
10076
|
Silliman, Garrett W.
|
PHASE 1 ARCHAEOLOGICAL SURVEY LETTER FOR TRILEAF CORPORATION Project # Cohutta (310976) Cohutta, Whitfield County, GA
|
This report documents the results of the archaeology survey for Trileaf Project # Cohutta / 310976, located
in Whitfield County, Georgia. The survey was conducted to ensure that resources eligible for or listed in the
|
Whitfield
|
2016
|
10071
|
Silliman, Garrett W.
|
PHASE 1 ARCHAEOLOGICAL SURVEY LETTER FOR TRILEAF CORPORATION Project #628547 (Dickey) Mineral Bluff, Fannin County, GA
|
Introduction
This report documents the results of the archaeology survey for Trileaf Project #628547 (Dickey), located in
Fannin County, Georgia. The survey was conducted to ensure that resources eligible for or listed in the
|
Fannin
|
2017
|
10070
|
Silliman, Garrett W.
|
PHASE 1 ARCHAEOLOGICAL SURVEY LETTER FOR TRILEAF CORPORATION Project #628476 (Brumbelow) Carrollton, Carroll County, GA
|
Introduction
This report documents the results of the archaeology survey for Trileaf Project #628476 (Brumbelow), located
in Carroll County, Georgia. The survey was conducted to ensure that resources eligible for or listed in the
|
Carroll
|
2017
|
10065
|
Silliman, Garrett W.
|
PHASE 1 ARCHAEOLOGICAL SURVEY LETTER FOR TRILEAF CORPORATION Project# 627859 (Greison Trail) Newnan, Coweta County, GA
|
Project Description
The subject property is approximately located at the approximate location of 40 Roberts Road, Newnan, GA
30263 at coordinates 33° 22’ 35.06” N, 84° 47’ 8.06” W. The proposed project consists of the construction of
|
Coweta
|
2016
|
9168
|
Silliman, Garrett W.
|
Phase I Archaeological Survey of Walton Court at US 78/SR 10 Realignment, Gwinnett County, Georgia
|
The proposed project consists of approximately 600 feet of new intersection construction on the north side of US 78 and directly across from existing Walton Court. The new intersection will tie into the re-alignment of Old Highway 78 (responsibility of the Brookwood Village developer).
|
Lowndes
|
2000
|
9162
|
Silliman, Garrett W., Hunt, Michael
|
Addendum to the Archaeological Survey for the West Bay Street Improvements, Savannah, Chatham County
|
The project length on West Bay Street has changed. The previous project limits were stated to begin at West Lathrop Avenue and end at East Lathrop Avenue, for a project length of 1.1miles. The actual project limits extend slightly west and east of these start and end points.
|
White
|
2011
|
9148
|
Silliman, Garrett W.
|
Addendum to Phase I Arch. Survey of the Proposed East Hiram Pkwy. Paulding, Georgia
|
2004: The project would begin on new location at the intersection of SR 92 and the proposed West Hiram Parkway and extend eastward approximately 2. 7 miles to the intersection of US 278 and Cleburne Parkway/ Popular Springs Road in Hiram.
|
Coweta
|
2001
|
8531
|
Silliman, Garrett W.
|
Phase I Archaeological Survey of the Proposed Improvements to the SR 120/Dallas Highway Project Corridor, Cobb County, Georgia
|
During August and September 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed improvements to State Route (SR) 120/Dallas Highway in Cobb County, Georgia. The proposed project (Georgia Department of Transportation [GDOT] Project No.
|
Banks
|
2014
|