Back to top

O'Connor, Lauren Welch

Report Number Author(s) Title Abstract Summary County Year
7569 Woodliff, John Dylan, O'Connor, Lauren Welch Phase I Archaeological Survey of the Proposed Signal Upgrades and Improvements to 18 Intersections, Baldwin County, Georgia

In October 2011 and May 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey for the proposed signal upgrades to 18 intersections (Georgia Department of Transportation [GDOT] Project No. CSSTP-0007-00[362], P.I. No.

Talbot 1998
8752 Pietak, Lynn Marie, Carbo, Andrew, O'Connor, Lauren Welch Phase I Archaeological Survey of Baldwin County Safe Routes to School

The proposed project consists of pedestrian improvements in Milledgeville, Baldwin County, Georgia. These improvements would occur within the vicinity of Blandy Hills Elementary School, Creekside Elementary School, Oak Hill Middle School, and Eagle Ridge Elementary School.

Columbia 2015
12349 O'Connor, Lauren Welch, Pappas, Andrew A. Third Addendum to a Phase I Archaeological Resources Survey of the Proposed Two Interchanges on Interstate 75, SR 7, and SR 122, Lowndes County, Georgia

The proposed GDOT project PI No. 0000762 would reconstruct eh I-75/SR 7 (Shiloh Road/North Valdosta Road) interchange. This would include transitioning Shiloh Road from a two-lane to a four-lane divided roadway with a 20-f00t raised concrete median and rural 6 ½ foot outside paved shoulders.

Lowndes 2018
12582 O'Connor, Lauren Welch, Pappas, Andrew A. Phase I Archaeological Resources Survey of the Proposed Interstate 20 (I-20) Bridge Replacement Over Big Indian Creek, Morgan County, Georgia

In June 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed Interstate 20 (I-20) bridge replacement located in Morgan County, Georgia (PI No. 0014903).

Morgan 2019
14226 O'Connor, Lauren Welch Phase I Archaeological Resources Survey of the Proposed County Road (CR) 30/ Airport Road Bridge Replacement Over Mossy Creek Tributary, White County, Georgia

In July 2019, Vanasse Hangen Brustlin, Inc.

White 2020
14230 O'Connor, Lauren Welch Phase I Archaeological Resources Survey of the Proposed County Street (CS) 666/ Cross Cedar Road Bridge Replacement over Big Cedar Creek, Johnson County, Georgia

In July 2019, Vanasse Hangen Brustlin, Inc.

Johnson 2020
14235 O'Connor, Lauren Welch Phase I Archaeological Resource Survey of the Proposed Widening of County Road (CR) 1515/ Willis Foreman Road, Richmond County, Georgia

In May 2019, Vanasse Hangen Brustlin, Inc (VHB) conducted a Phase I archaeological survey of the proposed County Road (CR) 1515/Willis Foreman Road widening from the intersection of United States (US) 1/State Route (SR) 4/Deans Bridge Road to the intersection with US 25/SR 121/P

Richmond 2020
14260 O'Connor, Lauren Welch Phase I Archaeological Resources Survey of the Proposed Widening of SR 12/ US 278/ Covington Highway, DeKalb County, Georgia

In March 2019, Vanasse Hangen Brustlin, Inc.

DeKalb 2020
14515 Wright, Andrew, O'Connor, Lauren Welch, Pappas, Andrew A. A Phase I Archaeological Survey of the Proposed County Road (CR) 49/Excelsior Church Road Bridge Replacement Over Ten Mile Creek, Candler County, Georgia

In November and December 2018, VHB completed a Phase I archaeological resources survey in support of the Georgia Department of Transportation (GDOT) proposal to replace the bridge carrying CR 49/Excelsior Church Road over Ten Mile Creek in Candler County, Georgia (Figures 1 and

Candler 2020
14558 O'Connor, Lauren Welch, Pappas, Andrew A. Second Addendum to Phase I Archaeological Resource Survey for the Proposed State Route 11 Bridge Replacement Over the Apalachee River, Walton and Barrow Counties, Georgia

In December 2018, VHB conducted a second addendum Phase I archaeological resource survey in support of the State Route (SR) 11 bridge replacement over the Apalachee River in Walton and Barrow Counties, Georgia.

Barrow 2019
Displaying 1 - 10 of 14