7569
|
Woodliff, John Dylan, O'Connor, Lauren Welch
|
Phase I Archaeological Survey of the Proposed Signal Upgrades and Improvements to 18 Intersections, Baldwin County, Georgia
|
In October 2011 and May 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey for the proposed signal upgrades to 18 intersections (Georgia Department of Transportation [GDOT] Project No. CSSTP-0007-00[362], P.I. No.
|
Talbot
|
1998
|
8752
|
Pietak, Lynn Marie, Carbo, Andrew, O'Connor, Lauren Welch
|
Phase I Archaeological Survey of Baldwin County Safe Routes to School
|
The proposed project consists of pedestrian improvements in Milledgeville, Baldwin County, Georgia. These improvements would occur within the vicinity of Blandy Hills Elementary School, Creekside Elementary School, Oak Hill Middle School, and Eagle Ridge Elementary School.
|
Columbia
|
2015
|
12349
|
O'Connor, Lauren Welch, Pappas, Andrew A.
|
Third Addendum to a Phase I Archaeological Resources Survey of the Proposed Two Interchanges on Interstate 75, SR 7, and SR 122, Lowndes County, Georgia
|
The proposed GDOT project PI No. 0000762 would reconstruct eh I-75/SR 7 (Shiloh Road/North Valdosta Road) interchange. This would include transitioning Shiloh Road from a two-lane to a four-lane divided roadway with a 20-f00t raised concrete median and rural 6 ½ foot outside paved shoulders.
|
Lowndes
|
2018
|
12582
|
O'Connor, Lauren Welch, Pappas, Andrew A.
|
Phase I Archaeological Resources Survey of the Proposed Interstate 20 (I-20) Bridge Replacement Over Big Indian Creek, Morgan County, Georgia
|
In June 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed Interstate 20 (I-20) bridge replacement located in Morgan County, Georgia (PI No. 0014903).
|
Morgan
|
2019
|
14226
|
O'Connor, Lauren Welch
|
Phase I Archaeological Resources Survey of the Proposed County Road (CR) 30/ Airport Road Bridge Replacement Over Mossy Creek Tributary, White County, Georgia
|
In July 2019, Vanasse Hangen Brustlin, Inc.
|
White
|
2020
|
14230
|
O'Connor, Lauren Welch
|
Phase I Archaeological Resources Survey of the Proposed County Street (CS) 666/ Cross Cedar Road Bridge Replacement over Big Cedar Creek, Johnson County, Georgia
|
In July 2019, Vanasse Hangen Brustlin, Inc.
|
Johnson
|
2020
|
14235
|
O'Connor, Lauren Welch
|
Phase I Archaeological Resource Survey of the Proposed Widening of County Road (CR) 1515/ Willis Foreman Road, Richmond County, Georgia
|
In May 2019, Vanasse Hangen Brustlin, Inc (VHB) conducted a Phase I archaeological survey of the proposed County Road (CR) 1515/Willis Foreman Road widening from the intersection of United States (US) 1/State Route (SR) 4/Deans Bridge Road to the intersection with US 25/SR 121/P
|
Richmond
|
2020
|
14260
|
O'Connor, Lauren Welch
|
Phase I Archaeological Resources Survey of the Proposed Widening of SR 12/ US 278/ Covington Highway, DeKalb County, Georgia
|
In March 2019, Vanasse Hangen Brustlin, Inc.
|
DeKalb
|
2020
|
14515
|
Wright, Andrew, O'Connor, Lauren Welch, Pappas, Andrew A.
|
A Phase I Archaeological Survey of the Proposed County Road (CR) 49/Excelsior Church Road Bridge Replacement Over Ten Mile Creek, Candler County, Georgia
|
In November and December 2018, VHB completed a Phase I archaeological resources survey in support of the Georgia Department of Transportation (GDOT) proposal to replace the bridge carrying CR 49/Excelsior Church Road over Ten Mile Creek in Candler County, Georgia (Figures 1 and
|
Candler
|
2020
|
14558
|
O'Connor, Lauren Welch, Pappas, Andrew A.
|
Second Addendum to Phase I Archaeological Resource Survey for the Proposed State Route 11 Bridge Replacement Over the Apalachee River, Walton and Barrow Counties, Georgia
|
In December 2018, VHB conducted a second addendum Phase I archaeological resource survey in support of the State Route (SR) 11 bridge replacement over the Apalachee River in Walton and Barrow Counties, Georgia.
|
Barrow
|
2019
|