7361
|
Woodliff, John Dylan
|
Phase I archaeological survey of the SR 9 Pedestrian Bridge over the Chattahoochee River, Fulton County, Georgia
|
The Georgia Department of Transportation (GDOT) in cooperation with the Chattahoochee River National Recreation Area (CRNRA) is in the beginning stages of project development for the above noted project.
|
White
|
2012
|
7569
|
Woodliff, John Dylan, O'Connor, Lauren Welch
|
Phase I Archaeological Survey of the Proposed Signal Upgrades and Improvements to 18 Intersections, Baldwin County, Georgia
|
In October 2011 and May 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey for the proposed signal upgrades to 18 intersections (Georgia Department of Transportation [GDOT] Project No. CSSTP-0007-00[362], P.I. No.
|
Talbot
|
1998
|
7898
|
Moss, Richard A., Woodliff, John Dylan
|
Phase I Archaeological Survey of the Atlanta Beltline Southwest Corridor, Fulton County, Georgia
|
Between September 16 and September 24, 2013, Edwards‑Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Atlanta BeltLine Southwest Corridor in Fulton County, Georgia (Georgia Department of Transportation [GDOT] Project No.CSSTP‑0009‑00[396], P.I. No.
|
Spalding
|
2012
|
8352
|
Lewis, Clifford Thomas, Woodliff, John Dylan
|
Phase I/II Archaeological and Metal Detector Survey of the Proposed SR 92 Improvements in the Vicinity of Pickett's Mill Battlefield, Cobb and Paulding Counties, Georgia
|
From December 3, 2013 to January 24, 2014, EPEI conducted a Phase I/II archaeological and metal detector survey along a portion of State Route (SR) 92, in Cobb and Paulding counties, from the SR 92/SR 381/Dallas Acworth Highway and County Road (CR) 473/Cedarcrest Road (hereafter CR 473) intersect
|
Barrow
|
2011
|
8947
|
Woodliff, John Dylan
|
Phase I Archaeological Survey of SR 140 Bridge over little River, Cherokee and Fulton Counties, Georgia
|
This project is to replace the existing two-lane SR 140/Houze Road bridge with a two-lane bridge. The existing bridge, constructed in 1952, is load limited with a sufficiency rating of 39; therefore, this bridge does not meet GDOT's current standards.
|
Jackson
|
1996
|
9963
|
Woodliff, John Dylan
|
Phase I Archaeological Survey of Proposed Bridge Maintenance Sites in Gwinnett and Franklin Counties, Georgia
|
The bridge maintenance project includes bridge jacking and associated approach work at two locations: CR120/Thompson Mill Road at I-985, and SR238/Gumlog Road at I-85.
|
Gwinnett
|
2017
|
12449
|
Woodliff, John Dylan
|
PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED REPLACEMENT OF THE SR 4/US 1 SOUTHBOUND BRIDGE OVER SOUTH PRONG CREEK, RICHMOND COUNTY, GEORGIA
|
Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase I archaeological survey of the proposed replacement of the southbound State Route (SR) 4/United States (US) 1 bridge over South Prong Creek in Richmond County, Georgia, located southwest of the city of Augusta.
|
Richmond
|
2018
|
13733
|
Woodliff, John Dylan, Moss, Richard A.
|
Phase I Archaeological Survey of Proposed Improvements and Widening of State Route (SR) 5 from SR 515 in Blue Ridge to Approximately Old Flowers Road, Fannin County, Georgia
|
Edwards-Pitman Environmental, Inc.
|
Fannin
|
2018
|
14453
|
Woodliff, John Dylan, Lewis, Clifford Thomas
|
Seventh Addendum Phase I Archaeological Survey for the Widening and Improvements of State Route (SR) 61 From South of County Road (CR) 467/Dallas Nebo Road to SR 6, Paulding County, Georgia
|
Edwards-Pitman Environmental, Inc.
|
Paulding
|
2021
|
14530
|
Woodliff, John Dylan
|
PHASE I ARCHAEOLOGICAL SURVEY AND PHASE II TESTING OF 9BK531 FOR THE PROPOSED REPLACEMENT OF THE SR 23 BRIDGES OVER BRIER CREEK AND BRIER CREEK OVERFLOW, BURKE COUNTY, GEORGIA
|
Edwards-Pitman Environmental, Inc.
|
Burke
|
2020
|