Lewis, Clifford Thomas

Report Number Author(s) Title Abstract Summary County Year
3103 Lewis, Clifford Thomas, Marcoux, Jon An Intensive Cultural_Resources Survey of Selected Areas Covering 13,265 Acres of Fort Benning Military Reservation, Georgia Volume III, Intensive Survey of Training Area G6, Fort Benning, Chatahoochee Country, Georgia

Under a continuing services contract with the U.S. Army Infantry Center, Directorate of Public Works, Environmental Division, Fort Benning Military Reservation, Panamerican Consultants, Inc. (PCI) conducted an intensive archaeological survey of 839 ac.

Chattahoochee County, GA 2005
3336 Lewis, Clifford Thomas, Quirk, Phillip W. Additional Phase I Archaeological Survey of the Proposed Social Circle Bypass, Newton and Walton Counties, Georgia

On March 14 and 15, 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional Phase I archaeological survey for the proposed Social Circle Bypass (Georgia Department of Transportation [GDOT] Project No. CSSTP-0007-00(217), P.I. No. 0007217) in Newton and Walton counties, Georgia.

Newton County, GA 2012
4416 Lewis, Clifford Thomas Ph I Survey for the Cedarcrest Rd. Improvement, Cobb and Paulding Counties, Georgia

The proposed road project would consist of the widening of Cedarcrest Road from Karl Sanders Drive just inside of Paulding County to Governor's Towne Drive from two to four lanes.

Cobb County, GA 2008
5937 Lewis, Clifford Thomas Third Reevaluation of West Cleveland Bypass

The original project remains the same except for the following: the beginning termini has been shifted approximately 300 ft south (old termini at Station 100+19.12 & new termini at Station 100+40.04) and the typical section is proposed to change due to environmental impacts, utility impacts,

Cobb County, GA 2010
5939 Lewis, Clifford Thomas Addendum to Phase 1 Survey for SR 53 Improvements, Gordon and Pickens Counties, Georgia

The proposed project includes the re-alignment of the existing highway to bring the horizontal and vertical curves up to current AASHTO design standards and adding six-foot paved and four-foot earthen shoulders for a total shoulder width of ten-feet for a distance of approximately 1.5 miles from

Fayette County, GA 1973
5942 Lewis, Clifford Thomas Phase 1 Archaeological Survey for the Proposed Busbee Drive-Fey Road Connector, Cobb County, Georgia

The proposed project consists of the addition of an approximately 0.5-mile new connector roadway (hereafter referred to as the Busbee-Frey Connector) over Interstate 75 (1-75) between Frey Road and Busbee Drive approximately 1,600 feet north of the 1-75/Chastain Road interchange in Cobb County,

Floyd County, GA 1996
7175 Lewis, Clifford Thomas, Quirk, Phillip W. Phase I of Archaeological Survey of the Proposed US 78/SR 10 Widening and the US 78 Crawford/Lexington Bypass and Phase II Archaeological Testing of Eight Sites, Clarke and Oglethorpe Counties, Georgia

From August 2008 to September 2010, Edwards-Pitman Environmental, Inc.

Monroe County, GA 1995
7364 Lewis, Clifford Thomas Phase I Achaeological Survey of Loiusville Safe Routes to School, Jefferson County, Georgia

This project consists of pedestrian improvements In the vicinity of Louisville Academy in Jefferson County, Georgia (see attached Figure 1).

Jasper County, GA 2012
7494 Lewis, Clifford Thomas Phase I Archaeological Survey of the Proposed SR 3/US 19/US 41/Tara Boulevard Widening, Clayton County, Georgia. GDOT Project No. NH000-0001-04(060), P.I. No. 722030 HP No. 111122-001

From July 16 to August 6, 2012, EPEI conducted a Phase I archaeological and metal detector survey of a portion of Tara Boulevard just south of Jonesboro, Georgia. This Georgia Department of Transportation (GDOT) project would improve Tara Boulevard from Tara Road north to Flint River Road.

Wilkinson County, GA 2001
7574 Lewis, Clifford Thomas Phase I Archaeological Survey of the Propsed SR 66 over Brasstown Creek Improvements and Phase II Testing of the High Bank site (9TO20), Towns County, Georgia

In February 2008 and March 2011, Edwards-Pitman Environmental, Inc. (EPEI) completed a Phase I archaeological survey for the proposed bridge replacement and right-of-way (ROW) realignment of State Route (SR) 66 over Brasstown Creek (Georgia Department of Transportation [GDOT] Project No.

Heard County, GA 2000