Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
3584 Pietak, Lynn Marie Phase I Archaeological Survey of the Peachtree Dunwoody Road Project Area, Fulton County, Georgia

This a GDOT Archaeological Short Form for Negative Findings of Phase I Archaeological Survey of the Peachtree Dunwoody Road Project Area in Fulton County, Georgia.

Fulton 2006
3585 Banguilan, Alvin J., Pietak, Lynn Marie Phase I Archaeological Survey of One Overpass Improvement and Three Interchange Modifications Along I-75, Tift County, Georgia

In October 2005 and February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey at four locations along I-75 in Tift County, Georgia.

Tift 2006
3604 Pietak, Lynn Marie Phase I Archaeological Survey of the Omega/Eldorado Road at I-75 Interchange, Tift County, Georgia

The proposed project would reconstruct the existing interchange on Interstate 75 (I-75) and County Road (CR) 418/Omega-Eldorado Road (Exit 55) in Tift County.

Tift 2006
3606 Pietak, Lynn Marie Phase I Archaeological Survey for the Navigator ATMS Expansion on US 78 (Stone Mountain Freeway), Dekalb & Gwinnett Counties, Georgia

The proposed project would consist of expanding the NaviGAtor system in DeKalb and Gwinnett Counties in order to provide traffic monitoring and surveillance and ramp meters on US 78 from the Lawrenceville Highway/US 29 interchange to the intersection with East Park Place Boulevard.

DeKalb 2006
3617 Pietak, Lynn Marie Addendum to Archaeological Survey of SR 280 Bridge Replacement over the Chattahoochee River in Cobb and Fulton Counties, Georgia

Original: The proposed bridge would be constructed east of the existing bridge, at a centerline-to-centerline offset distance of approximately 17 ft.

Cobb 2006
3622 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia

In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.

Clayton 2006
3630 Banguilan, Alvin J., Pietak, Lynn Marie Phase I Archaeological Survey of the Lester Mill & Bethlehem Roads Improvements Project Corridor, Henry County, Georgia

In February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed Lester Mill Road and Bethlehem Road improvements project. The length of the project corridor is approximately 2.5 miles.

Henry 2006
3633 Silliman, Garrett W., Pietak, Lynn Marie Second Addendum to Intensive Archaeological Survey of the Proposed Big Horse Creek Bridge Replacement, Telfair County, Georgia

In February 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over Big Horse Creek, Telfair County, Georgia. The total length of the redesigned project is 0.50 miles.

Telfair 2006
3634 Pietak, Lynn Marie Second Addendum to Phase I Archaeological Survey of LaVista Road, N. Druid Hills Road, Chamblee Tucker Road, and Lawrenceville Hwy. Signal Design Project Areas, DeKalb County, Georgia

The proposed project would consist of traffic signal upgrades at 34 intersections in DeKalb County.

DeKalb 2006
3635 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Columbia Drive, Covington Highway, & Mountain Industrial Blvd. Signal Design Project Areas, DeKalb County, Georgia

Since the original short form was submitted, one intersection was dropped (Flat Shoals Pkwy. @ Snapfinger Rd.) and three were added: Covington Hwy. @ S. Hairston, Covington Hwy. at Mary Bethune, and Columbia Drive at Casa Linda Drive.

DeKalb 2006
Displaying 171 - 180 of 538