Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
6789 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Regional Express Service Park and Ride Facility Project Area, Cobb County, Georgia

In October 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Cobb County Regional Express Service Park and Ride Facility.

Clayton 1990
6794 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Clayton County Justice Center Park and Ride Facility Project Area, Clayton County, Georgia

In October 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Clayton County Justice Center Park and Ride Facility project area.

Clayton 1988
6869 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Valdosta Regional Airport Expansion Project Area, Lowndes County, Georgia

In September 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location of the Valdosta Regional Airport expansion project.

Lowndes 1973
7012 Carbo, Andrew, Pietak, Lynn Marie Phase I Archaeological Survey of Muscogee County Safe Routes to School

The proposed project would consist of pedestrian improvements in the vicinity of Club view Elementary School in Muscogee County, Georgia. Concrete sidewalks would be installed along Sue Mack Drive.

Floyd 1973
7058 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Walkers Church Substation, Greene County, Georgia

During May 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Walkers Church Substation.

Gordon 2001
7282 Pietak, Lynn Marie Phase I Archaeological Survey of ITS Enhancement, Phase 3, Traffic Signal Timing System Installation, Cobb County, Georgia

This project would install an adaptive traffic signal timing system in 69 traffic signals within the Cumberland CID area. The installation of video detection and replacement of traffic signal cabinets and controllers is also included.

Jones 1997
7355 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of Signal Upgrades, Columbia and Richmond Counties, Georgia

Additional right-of-way (ROW) is now required at Intersections 3, 4, 5, and 7, totaling 8166.59 square feet. The specific requirements appear in the table below.

Lincoln 2012
7358 Pietak, Lynn Marie Phase I Archaeological Survey of Marietta Safe Routess to School, Cobb County, Georgia

The proposed project would provide pedestrian improvements for students of Park Street Elementary School, Westside Elementary School, Marietta Middle School and A. L. Burruss Elementary School in the City of Marietta, Georgia (see Figure 1, Project Location).

Lumpkin 2012
7380 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the Proposed SR 53 Over Chestatee River (Lake Lanier) Bridge Replacement, Forsyth and Hall Counties, Georgia

During November 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed State Route (SR) 53 over the Chestatee River (Lake Lanier) Bridge Replacement. The project corridor is located in Forsyth and Hall counties, Georgia.

Coffee 2012
7384 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Surveye of the Broad Avenue Bridge over the Flint River and Phase II Archaeological Testing of Site 9DU193, Dougherty County, Georgia

In March, June, July, September and October 2010, Edwards-Pitman Environmental, Inc.

Putnam 1987
Displaying 411 - 420 of 538