Back to top

Kosalko, Katherine

Report Number Author(s) Title Abstract Summary County Year
14268 Kosalko, Katherine, Millis, Tracy L., Burr, Jessica, Holland, Jeffrey L., Laird, Price K., Banguilan, Alvin J., Webb, Paul A., Farrow, Fritz PHASE I CULTURAL RESOURCE SURVEY OF THE GEORGIA PORTION OF THE SABAL TRAIL PROJECT, STEWART, WEBSTER, TERRELL, LEE, DOUGHERTY, MITCHELL, COLQUITT, BROOKS, AND LOWNDES COUNTIES, GEORGIA

Stewart 2015
14356 Kosalko, Katherine, Burr, Jessica Phase I Cultural Resource Survey of the Georgia Portion of the Sabal Trail Project, Stewart, Webster, Terrell, Lee, Dougherty, Mitchell, Colquitt, Brooks, and Lowndes Counties, Georgia, Revised Draft Report, Addendum 4

Sabal Trail Transmission, LLC (Sabal Trail), a joint venture between affiliates of Spectra Energy Partners, LP, NextEra Energy, Inc., and Duke Energy Corporation, has been issued a Certificate of Public Convenience and Necessity from the Federal Energy Regulatory Commission (FER

Stewart 2016
14390 Kosalko, Katherine Phase I Archaeological Survey for the Proposed S&S Greenway Trail Extension (Phase III), Bulloch County, Georgia

In June of 2020, Edwards-Pitman, Inc. (EP) completed a Phase I archaeological survey for the proposed S&S Greenway Trail Extension (Phase Ill) in Bulloch County, Georgia. The project was conducted for the Georgia Department of Transportation (GDOT) (P.I. No.

Bulloch 2021
14478 Kosalko, Katherine Third Addendum Phase I Archaeological Survey for the Proposed SR 25 Spur East at Mackay River Bridge Replacement, Glynn County, Georgia

The proposed project would consist of replacing the existing bridge on State Route (SR) 25 Spur East (County Road [CR] 582/Torras Causeway) over the Mackay River 4.8 kilometers (km) (3 miles [mi]) east of Brunswick, Georgia (Figure 1).

Glynn 2021
14493 Kosalko, Katherine PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED SR 16 AT SR 42 ROUNDABOUT, BUTTS COUNTY, GEORGIA

In August and November of 2020, Edwards-Pitman, Inc.

Butts 2021
14516 Kosalko, Katherine, Tarleton, Matthew, Zoino, Jayson Addendum Phase I Archaeological Survey for the SR 86 Overpass at I-16 Emergency Repair Project, Treutlen County, Georgia

On July 15, 2021 a tractor trailer struck the bridge at the State Route (SR) 86 overpass bridge on Interstate (I-)16 in Treutlen County, Georgia.

Treutlen 2021
14590 Kosalko, Katherine PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT AT SR 1/US 27 OVER FLAT SHOAL CREEK, TROUP COUNTY, GEORGIA

Edwards-Pitman Environmental, Inc.

Troup 2020
14594 Kosalko, Katherine PHASE I ARCHAEOLOGICAL SURVEY FOR PROPOSED RIDGE REPLACEMENT ON SR 25 AT THE MIDDLE RIVER, CHATHAM COUNTY, GEORGIA

Edwards-Pitman, Inc. (EP), has conducted a Phase I archaeological survey for the proposed demolishment and replacement of a bridge (Bridge Serial No.

Chatham 2020
14604 Kosalko, Katherine PHASE I ARCHAEOLOGICAL SURVEY OF BIG CREEK GREENWAY CONNECTOR, FULTON COUNTY, GEORGIA

Edwards-Pitman, Inc. (EP) completed a Phase I archaeological survey of the Big Creek Greenway Connector from Bethany Bend Road to Big Creek Greenway in the City of Milton, Fulton County, Georgia.

Fulton 2021
14661 Kosalko, Katherine Phase I Archaeological Survey for the Proposed Bridge Replacement on SR 25 at the Savannah River, Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), has conducted a Phase I archaeological survey for the proposed bridge replacement on State Route (SR) 25 at the Savannah River in Chatham County, Georgia (GDOT PI No. 0013741, HP No. 81019-001).

Chatham 2019
Displaying 11 - 20 of 21