Back to top

Kemmerlin, Aspen

Report Number Author(s) Title Abstract Summary County Year
12119 Pappas, Andrew A., Kemmerlin, Aspen, Banguilan, Sarah Cole First Addendum to a Phase I Archaeological Survey of the Peachtree Rd. Improvements from Shadowlawn Ave to Maple Dr – Phase III, Fulton County, Georgia

This addendum report has been prepared to address design changes to PI 0006684. This project was previously evaluated by GT Hill Planners in an Archaeological Short Form for Negative Findings, which was approved by the Georgia Department of Transportation (GDOT) on October 2, 2014 (Koch 2014).

Fulton 2018
12142 Kemmerlin, Aspen 2019 Addendum to Phase I Archaeological Survey of State Route (SR) 169/Lanes Bridge Road Replacement over Goose Creek, Wayne County, Georgia

A potential bridge replacement has been identified along State Route (SR) 169/ Lones Bridge Rood (Rd)

Wayne 2019
14563 Donnan, Benjamin A., Kemmerlin, Aspen, Pappas, Andrew A. Revised Addendum (3rd) Phase I Archaeological Resources Survey and Assessment of Effects of the Proposed Reconstruction of the I-16/I-75 Interchange, Bibb County, Georgia

In December of 2019 and January of 2020, VHB conducted an addendum Phase I Archaeological Resource Survey of the proposed reconstruction of the interchange between I-16 and I-75 in Bibb County, Georgia.

Bibb 2020
Displaying 1 - 3 of 3