6461 Shirk, Elizabeth C. Archaeological Assessment of Project STP-090-2(27), Treutlan/Emanuel/Johnson Counties

The proposed project consists of shoulder paving, 0.61 m (2 ft) left and right, of SR 15 beginning at 1-16 and extending north to US 80 in Adrian. No additional right-of-way would be required for the proposed project.

Glynn 2004
6505 Shirk, Elizabeth C. Archaeological Assessment of Project PR-43(109), Evans County

Project PR-43(109) consists of paving County Roads 43 and 44 in Evans County. Alignment will be symmetrical, to the north, and to the south with approximately 213.4 m (700 ft) of new location. Proposed right-of-way is 24.4 m (80 ft) . Project length is 6.5 kilometers (4.058 mi).

Cobb 1985
6914 Shirk, Elizabeth C. Archaeological Re-Assessment of Project EDS-565(7)(13), Jenkins/Screven Counties

The following is being furnished to you for inclusion as written, in the appropriate environmental document:

White 1993
6920 Shirk, Elizabeth C. Archaeological Assessment of Project STP-036-1(25), Tift/Irwin

The following is being furnished to you for inclusion as written, in the appropriate environmental document:

Hart 1977
7307 Shirk, Elizabeth C. Archaeological Assessment of Gordon County GEPA Project

The proposed intersection improvement project consists of the addition of left and right turn lanes for the North and South bound lanes of SR 61/ US 411 at the intersection of SR 61/US 411 and SR 136. Existing right-of-way varies from 61 m (200 ft) to 36.5 m (120 ft).

Lowndes 1987
8351 Shirk, Elizabeth C. Archaeological Assessment of Project STP-065-3(54), Jackson County

The proposed project consists of left and right shoulder pavement of S.R. 53 in Jackson County. The proposed shoulder pavement varies from 0.6 m (2 ft) to 1.2 m (4 ft). The project will begin at the Hall County line and will end at the Barrow County line for a distance of 14.3 km (8.8 mi).

Richmond 2010
8397 Shirk, Elizabeth C. Archaeological Assessment of Project STP-0910(14), Jackson County

The proposed project consists of left and right shoulder pavement of S.R. 124 in Jackson County from approximately 143 m (470 ft) north of S.R. 53 to S.R. 11 for a distance of 15.8 km (9.8 mi). The proposed shoulder pavement varies from 0.6 m (2 ft) to 1. 2 m (4 ft).

Glynn 2001
8691 Shirk, Elizabeth C. P.I. 0005870, PRP-0005-00(870) Bridge Replacement Little Pine Log Creek, Nally Road/CR 204

The proposed project would consist of the proposed replacement of the Little Pine Log Creek Bridge on Nally Road/CR 204. The existing bridge is 180' long and 30' wide. The proposed structure would be 30' wide and 290.4' long.

Dooly 2014
9369 Shirk, Elizabeth C. Landings at Crooked River, Camden County, Georgia, HP-060104-015

The Historic Preservation Division (HPD) has reviewed the information submitted concerning the above referenced undertaking.

Camden 2006
9387 Shirk, Elizabeth C. Construct Two Poultry Houses, CR 552, South of Baxley

We have determined this action to be a "potential undertaking".

Appling 2006