Back to top

Moss, Richard A.

Report Number Author(s) Title Abstract Summary County Year
8828 Moss, Richard A. Phase I Archaeological Survey of Traffic Signal Upgrades at 16 Locations in Southwest Atlanta, Fulton County, Georgia

The proposed project consists of upgrading 16 intersections within Fulton County. The purpose of this project is to improve operational efficiency and pedestrian facilities at these intersections.

Bartow 2014
8908 Moss, Richard A. Phase I Archaeological Survey of Traffic Signal Upgrades at Ten Locations Along Piedmont Road in Buckhead, Fulton County, Georgia

The proposed project would consist of upgrading the existing traffic signal installations at 10 intersections in Fulton County and the city of Atlanta.

Jackson 2002
8989 Moss, Richard A. Phase I Archaeological Survey of Traffic Signal Upgrades at Four Locations in DeKalb County, Georgia

The proposed project would consist of upgrading the existing traffic signal installations at four intersections in DeKalb County along approximately 0.38 miles of Clairmont Road, as depicted on the Project Location Map (see Figure 1). The intersections are as follows:

Fulton 2008
9037 Moss, Richard A. Cultural Resources Survey and GPR Investigation of Trahlyta's Grave Stonepile for Proposed Improvements to the US 19/SR 9 and SR 60 Intersection in Lumpkin County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a cultural resources survey for Georgia Department of Transportation (GDOT) proposed safety improvements to the intersection of United States (US) 19/State Route (SR) 9 and SR 60 in Lumpkin County, Georgia (P.I. No. 0009950; HP No. 131227-005).

Stephens 2003
9129 Moss, Richard A. Phase I Addendum Archaeological Survey For The Proposed Widening Of SR 15/US 441 In Rabun County, Georgia

On October 12, 2015, Edwards-Pitman Environmental, Inc.

Effingham 1976
9136 Carbo, Andrew, Moss, Richard A., Pietak, Lynn Marie Phase I Archaeological Survey Of The Proposed SR 42 Spur/McDonough Boulevard SE Bridge Over The Norfolk Southern Railroad, Fulton County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed bridge replacement at State Route (SR) 42 Spur/McDonough Boulevard over the Norfolk Southern Railway in Fulton County, Georgia (Georgia Department of Transportation [GDOT] P.I. No.

Fulton 1987
9583 Moss, Richard A., Trudeau, Mary F. Phase I Archaeological Survey of Proposed Traffic Signal Upgrades at Nine Intersections in Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with Wolverton & Associates, Inc., conducted Phase I archaeological survey for the Georgia Department of Transportation (GDOT) project to upgrade traffic signals at nine intersections in Chatham County, Georgia (PI No.

Chatham 2017
9586 Moss, Richard A. Phase I Archaeological Survey of a Proposed Turn Lane at the Intersection of State Route (SR) 138 and Amherst Lane, Rockdale County, Georgia

State Route (SR) 138 is a two-lane road that is classified as an Urban Principal Arterial. SR 138 currently has an eastbound right turn lane for Amherst Lane.

Rockdale 2017
9588 Moss, Richard A. Second Addendum Phase I Archaeological Survey of Proposed Intersection Improvements, Group 2, DeKalb County, Georgia.

The project consists of improvements to 40 intersections in the Decatur and Avondale areas. A complete list of project intersection locations is provided in an attachment. Previous Phase I survey at these intersections resulted in negative findings (Smith 2005a, 2006).

DeKalb 2016
9760 Moss, Richard A. Additional Phase I Archaeology Survey of Six Parcels at the Mclemore Cove Mitigation Site in Walker County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with New South Associates, Inc.

Walker 2016
Displaying 11 - 20 of 38