9799
|
Moss, Richard A.
|
Phase I Archaeological Survey of Atlanta BeltLine Southside Trail, Fulton County, Georgia
|
Between December 16, 2016 and January 13,2017, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Atlanta BeltLine Southside Trail in Fulton County, Georgia (Georgia Department of Transportation [GDOT] P.I. No. 0009397, HP No.15 L 030-00 L).
|
Fulton
|
2017
|
9837
|
Moss, Ashley E., Moss, Richard A.
|
Addendum Phase I Archaeological Survey for Stream Restoration, Interstate (I)-75 at State Route (SR) 156/Red Bud Road Interchange Improvements, Gordon County, Georgia
|
The original project description for PI 610750, under construction, has not changed.
|
Gordon
|
2017
|
10028
|
Moss, Richard A.
|
GDOT ARCHAEOLOGICAL SHORT FORM FOR NEGATIVE FINDINGS: Addedum Phase I Archaeological Survey of the Atlanta Beltline Southwest Corridor, Fulton County, Georgia
|
This proposed GDOT undertaking (Project No. CSSTP-0009-00[396], P.L No. 0009396, HP No.130926-002) would provide for a multi-use trail from Lena Street to University Avenue in southwest Atlanta within a former railroad corridor.
|
Fulton
|
2016
|
10083
|
Quirk, Phillip W., Moss, Richard A.
|
PHASE I ARCHAEOLOGICAL SURVEY FOR FY 16 DESIGN BUILD REPLACEMENT PROJECTS - BATCH 3, COWETA, CRAWFORD, HARRIS, MARION, MERIWETHER, AND PIKE COUNTIES, GEORGIA GDOT P.I. NO. 0014176, GP NO. 151221-001
|
On December 15, 2015, Edwards-Pitman Environmental, Inc. (EPEI), conducted a Phase I archaeological survey for Fiscal Year (FY) 16 Design Build Replacement Projects-Batch 3 (P.I. No. 0014176, GP No.
|
Coweta
|
2016
|
10544
|
Moss, Richard A.
|
Phase II Archaeological Testing of 9CA33, US 78/SR 10 Lexington Road Widening, Clarke County, Georgia; GDTO Project No. STP00-0014-01(069), P.I. NO. 132660
|
Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase II archaeological testing at 9CA33 within the area of potential effect (APE) of the United States (US) 78/State Route (SR) 10 widening project in Clarke County, Georgia.
|
Clarke
|
2014
|
10865
|
Moss, Richard A.
|
Phase I Archaeological Survey For The Proposed Oconee River Greenway and Riverwalk (Phase 3), Milledgeville, Georgia
|
Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the Georgia Department of Transportation (GDOT) funded project m expand the Oconee River Greenway and Riverwalk along Fishing Creek in Milledgeville, Georgia (P. I. o.
|
Baldwin
|
2016
|
12424
|
Kosalko, Katherine, Moss, Richard A.
|
Phase I Archaeological Survey for Proposed SR 135 Bridge Replacement, Jeff Davis and Montgomery Counties, Georgia
|
Edwards-Pitman Environmental, Inc. (EPEI), has conducted a Phase I archaeological survey under a contract with Reynolds Smith & Hills, Inc.
|
Jeff Davis
|
2018
|
12805
|
Brummeler, Charles K., Moss, Richard A.
|
FIFTH ADDENDUM PHASE I ARCHAEOLOGICAL SURVEY FOR PROPOSED GRADE SEPARATION OF SR 316/US 29 AT SR 11, BARROW COUNTY, GEORGIA
|
The fifth addendum Phase I archaeological survey for the proposed Georgia Department of Transportation (GDOT) project to build a grade separated interchange of State Route (SR) 316/United States Highway (US) 29 at SR 11 in Barrow County, Georgia (GDOT Project No. CSNHS-0008-00 [ 430], Pl No.
|
Barrow
|
2019
|
12808
|
Moss, Richard A., Sipe, Ryan O.
|
Geophysical Survey Report for Addendum Phase I Archaeological Survey of Atlanta Beltline Southside Trail, Fulton County, Georgia
|
On October 10, 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted a supplemental ground penetrating radar (GPR) investigation in order to further investigate buried historic streetcar resources potentially affected by Atlanta BeltLine, Inc.’s (ABI’s) proposed Southside Trail (Figure 1).
|
Fulton
|
2016
|
13715
|
Moss, Richard A.
|
Addendum Phase I Archaeological Survey of the Proposed Reconstruction of the Bridge on SR 18 at CS X Railroad in Durand, Meriwether County, Georgia
|
Edwards-Pitman Environmental, Inc. (EPEI), under a contract with Atkins North America, conducted additional Phase I archaeological survey for the Georgia Department of Transportation (GDOT) project to reconstruct the State Route (SR) 18 bridge at the CSX railroad in Durand, Georgia (Project No.
|
Meriwether
|
2016
|