Report Number Author(s) Title Abstract Summary County Year
12451 Pietak, Lynn Marie, Brummeler, Charles K. Phase I Archaeological Survey for the Augusta Multi – Use Trail, Phase III Richmond County, Georgia

River Levee Trail Phase 3D was originally designed as an asphalt trail (12 feet wide along Trall Section "A", 10 feet wide along Trail Section "B", and 8 feet wide along Trail Section "C") that would have provided an improved trail surface on the existing trail system.

Richmond 2018
12523 Pietak, Lynn Marie, Brummeler, Charles K. Phase I Archaeology Survey for the Bridge Replacement of SR 81 over Dried Indian Creek, Newton County, Georgia

Georgia Department of Transportation (GDOT) Project P.I. No. 0013751 in Newton County would replace the existing two-lane bridge on State Route (SR) 81 over Dried Indian Creek in Covington, Georgia. The new bridge would be constructed on existing alignment.

Newton 2018
12524 Pietak, Lynn Marie, Brummeler, Charles K. Phase I Archaeological Survey for the Bridge Replacement of State Route 77 Spur over Cedar Creek

The bridge on State Route (SR) 77 Spur over Cedar Creek, Structure ID 147-0013-0, was built in 1957. This bridge consists of three spans of continuous steel girders on concrete caps with concrete columns. The bridge has fatigue prone members (cantilever shoe bearings) in the superstructure.

Hart 2018
12728 Brummeler, Charles K. Phase I Archaeological Survey for the Bridge Replacement of SR 376 over the Alapohoochee River, Echols County, Georgia

The proposed project would replace the existing two-lane bridge on State Route (SR) 376 over the Alapohoochee River between the towns of Statenville and Lake Park with a new bridge consisting of two 12-foot lanes and 8-foot shoulders.

Echols 2018
12805 Brummeler, Charles K., Moss, Richard A. FIFTH ADDENDUM PHASE I ARCHAEOLOGICAL SURVEY FOR PROPOSED GRADE SEPARATION OF SR 316/US 29 AT SR 11, BARROW COUNTY, GEORGIA

The fifth addendum Phase I archaeological survey for the proposed Georgia Department of Transportation (GDOT) project to build a grade separated interchange of State Route (SR) 316/United States Highway (US) 29 at SR 11 in Barrow County, Georgia (GDOT Project No. CSNHS-0008-00 [ 430], Pl No.

Barrow 2019
14490 Brummeler, Charles K. Addendum to the Phase I Archaeological Survey of the State Route 81 Widening and Improvements Corridor from Lemon Street to Bethany Road, Henry County, Georgia.

The Georgia Department of Transportation (GDOT) proposes to widen State Route (SR) 81 from two lanes to four lanes for 3.02 miles between Lemon Street and Bethany Road in the City of McDonough.

Henry 2021
14511 Brummeler, Charles K. Phase I Archaeological Survey for the Bridge Replacement of County Road 35 over McBean Creek, Burke County, Georgia – USACE Section 106 Report (SAS # 2021-00603)

In accordance with the Georgia Department of Transportation (GDOT) Low Impact Bridge Program (LIBP), a potential bridge replacement has been identified along County Road (CR) 35/Old Waynesboro Road, located in Burke County, Georgia (Figure

Burke 2020
Displaying 1 - 7 of 7