Back to top

Gresham, Thomas H.

Report Number Author(s) Title Abstract Summary County Year
2060 Gresham, Thomas H. An Archaeological Survey of Proposed Improvements to Cumming Highway and Webb Road Intersection Fulton County, Georgia

On June 6, 2000 an archeological survey was conducted within the area of potential effect for a proposed reconstruction of the existing intersection of Cumming Highway and Webb Road, in northern Fulton County.

Fulton 2001
2061 Gresham, Thomas H. An Archaeological Survey of Proposed Improvements to Arnold Mill Road and Green Road Intersection, Fulton County, Georgia

On June 6, 2000 an archeological survey was conducted within the area of potential effect for a proposed reconstruction of the existing intersection of Arnold Mill Road and Green Road, in northern Fulton County.

Fulton 2001
2063 Gresham, Thomas H. An Archaeological Survey of Three Proposed Bridge Replacements, Oglethorpe County, Georgia

On November 8, 2000, Southeastern Archeological Services conducted an intensive archeological survey for the proposed replacement of two bridges on S.R. 22 and one on S.R. 77 in Oglethorpe County, Georgia.

Oglethorpe 2001
2094 Gresham, Thomas H. Archaeological Survey of Two Bridge Replacements in Fulton County, Georgia

The Georgia Department of Transportation (GDOT) wishes to replace two aging bridges in southern Fulton County, Enon Road over Camp Creek and Cochran Mill Road over Little Pea Creek (Figure 1). Both are on small, two-laned county roads that cross small creeks.

Fulton 2001
2096 Gresham, Thomas H. An Archaeological Survey of Proposed Improvements to Hardscrabble Road and Chaffin Road Intersection, Fulton County, Georgia

On January 10, 2001 an archeological survey was conducted within the area of potential effect for a proposed reconstruction of the existing intersection of Hardscrabble Road and Chaffin Road, in north Fulton County.

Fulton 2001
2106 Gresham, Thomas H. Archaeological Survey of Two Bridge Replacements

The Georgia Department of Transportation (GDOT) wishes to replace two bridges on State Route 323 in the eastern Hall County (Figure 1). The two bridges are 165 m apart and cross the main channel of the North Oconee River and an overflow channel of the river.

Hall 2001
2110 Gresham, Thomas H. Archaeological Survey of the Buie Turpentine Complex Bypass

The Georgia Department of Transportation (GDOT) is in the process of widening U.S. Highway 441 to a four lane-divided highway, and as part of the process conducted cultural resource surveys in Dodge, Laurens and Wheeler Counties in 1995.

Dodge 2001
2114 Gresham, Thomas H. An Archaeological Survey of the Proposed Widening of Riverside Drive

In late March 2001, Southeastern Archeological Services conducted an intensive archeological survey of the proposed widening of a 3.8 km (2.4 mi) length of Riverside Drive in Macon.

Bibb 2001
2128 Gresham, Thomas H. Archeological Survey of Three Bridge Replacements in Stewart and Webster Counties

The Georgia Department of Transportation (GDOT) wishes to replace three bridges on State Routes' in the southwestern counties of Stewart and Webster (Figure 1).

Stewart 2001
2134 Martin, Gordon, Gresham, Thomas H. Archaeological Assessment of the Navigator Weather Monitoring Stations

The purpose of this project is to expand the Georgia DOT's NaviGAtor System with the construction of33 weather monitoring and reporting devices.

Banks
Displaying 161 - 170 of 605