Back to top

Stitcher, David

Report Number Author(s) Title Abstract Summary County Year
14405 Eberwine, James, Stitcher, David Addendum Report: Phase I Cultural Resources Survey of an Access Road Associated with the Southern Natural Gas Mid-State Energy Access Road Project

The survey area measured approximately 250 x 10 m in size and it extended north from Loraine Forest Road to the proposed Mid-South Meter Station. The proposed access road was in a wooded area west of an existing pipeline corridor.

Monroe 2021
14437 Eberwine, James, Stitcher, David Phase I Cultural Resources Survey of the Southern Natural Gas/Magnolia Hazlehurst Delivery Project

The project entails the construction of a meter station interconnect facility in conjunction with Magnolia and Atlanta Gas and Light, Co. (AGLC).

Jeff Davis 2021
14792 Powers, Erin, Stitcher, David Phase I Cultural Resources Survey of the Kinder Morgan/Rome HWY 411 HDD

The project entails the construction through horizontal directional drilling of a pipeline tie-in to a previously constructed pipeline perpendicular to Highway 411 in Rome, GA. Temporary workspace is required to the north and south of Highway 411.

Floyd 2021
Displaying 1 - 3 of 3