Back to top

Rotenstein, David S.

Report Number Author(s) Title Abstract Summary County Year
5007 Rotenstein, David S. Archaeological Assessment of Project N-AD-20-(14), Camden County

No significant archaeological resources were located within the proposed project corridor as described in paragraph two above.

Monroe County, GA 1997
5118 Rotenstein, David S. Archaeological Assessment of Project FR055-5(17), Chatham

The project begins in Bloomingdale at County Road S. 1841 and extends easterly for a distance of 2.5 miles, to a point in Pooler. A corridor 150 feet wide was surveyed.

Paulding County, GA 2005
5119 Rotenstein, David S. Archaeological Assessment of Project F-111-1(16)Spur, Chatham County

The project proposes construction of a connector, on new location, from S.R. 204, Abercorn Street, to S.R. 21 (1-516), Lynes Parkway. The project begins as at a point approximately one mile west of the S.R. 204 crossing of the Little Ogeechee River and terminates at the point where S.R.

Putnam County, GA 2009
5120 Rotenstein, David S. Archaeological Assessment of Project FR-005-5(16), Chatham County

The project is the proposed widening of S.R. 26/U.S. 80 from 1-95 in Pooler to the bridge over the Central of Georgia Railroad in Garden City. The project would widen the existing facility within a 100 to 200 foot right-of-way for 5.4 miles.

Camden County, GA 1981
5121 Rotenstein, David S. Archaeological Assessment of Project BRF-005-5(15), Chatham County

The proposed project is the replacement of the Bay Street viaduct, U.S. 17/S.R. 26. The project entails the total replacement of the viaduct and the widening of the existing approaches from a three lane section to a five lane section.

Chatham County, GA 1996
5122 Rotenstein, David S. Archaeological Assessment of Project F-041-2(32), Chatham-Effingham

Project F-041-2(32) is the proposed widening of Ga. 21 from the north city limits of Rincon to the junction of Interstate 95. The project corridor is 9.4 miles long and 134 feet wide.

Chatham County, GA 1996
5124 Rotenstein, David S. Archaeological Assessment of Project Fr-064-1(31), Chatham

This project is the widening and reconstruction of S.R. 25/U.S. 17, Atlantic Coastal Highway from the traffic circle at the intersection of S.R. 25/U.S. 17 and S.R. 21/U.S. 80. The project continues north to the intersection with S.R. 21 Spur.

Chatham County, GA 1997
5239 Rotenstein, David S. Archaeological Assessment of Project FR-149-1(12), Liberty County

No significant archaeological resources were located within the proposed project corridor as described in paragraph two above.

Liberty County, GA 1977
5243 Rotenstein, David S. Archaeological Assessment of Project BRF-149-1(11), Liberty County

No significant archaeological resources were located within the proposed project corridor as described in paragraph two above.

Lee County, GA 1999
5244 Rotenstein, David S. Archaeological Assessment of Project FR-149-1(12), Liberty County

No significant archaeological resources were located within the proposed project corridor as described in paragraph two above.

Muscogee County, GA 2001
Displaying 11 - 20 of 244