Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
8084 Duff, Eric Anthony Archaeological Reassessment of Project CSSTP-0007-00(408), Liberty/Tatnall Counties

The proposed project would consist of traffic signal upgrades at six intersections (four traffic signals in the City of Hinesville and two in the City of Glennville). All proposed construction would be restricted to within the existing right-of-way at each of the six intersections.

Fulton 2012
8212 Duff, Eric Anthony Archaeological Assessment of Project IM-NH-75-1(192), Bibb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project IM-NH-75-1(192), Bibb County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Towns 2013
8214 Duff, Eric Anthony Archaeological Assessment of Project PR-34(231), Pike County

Project PR-34 (231) in Pike County allows for grading, drainage, base and surfacing on CR 34 for approximately 2.8 kilometers (1.74 miles). The proposed project on CR 34 would begin at CR 32 then continue westerly and northerly to an end point at the Spaulding County Line.

McDuffie 2013
8216 Duff, Eric Anthony Archaeological Assessment of Project STP-2940(6), Pike County

The proposed project consists of the realignment of SR 362 to eliminate the existing "S" curve. The project would.also include realignment improvements on the adjacent intersecting streets: CR 196/Pine St., CR 249/Williamson Rd., and CR 44/Second District Rd.

Fulton 2013
8292 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project BRSLB-3048(1), Colquitt County

The proposed project would consist of replacing the bridge spanning Okapilco Creek along Adel Road in Colquitt County. The existing bridge is a 120' X 40' concrete structure, and will be replaced with a 160' X 40' concrete structure on existing alignment.

Dodge 2011
8295 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project BRZLB-71(28), Colquitt County

The proposed project would consist of replacing the bridge spanning Ochlockonee River along CR 186 in Colquitt County. The existing bridge is a 140' X 19' concrete structure, and will be replaced with a 180' X 28' concrete structure on existing alignment.

Chatham 2011
8296 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Assessment of Project BRZLB-71(30), Colquitt County

Project BRZLB-71(30) would replace the existing bridge over the Ochlockonee River tributary on SW 13th Ave/CS 835 in the city of Moultrie, Georgia. The proposed project would include construction and slope easements on either side of SW 13th Ave./CS 835.

Spalding 2014
8297 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Assessment of Project NHS-0000-00(429), Colquitt County

Project NHS-0000-00( 429) would reconstruct SR 35/US 319 beginning at Magnolia Lane and terminating at mile post 11.20 in Colquitt County. The proposed project would replace the existing depressed median and open ditches with a raised median.

Bibb 2011
8299 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Reassessment of Project NHS-0000-00( 429), Colquitt County

Project NHS-0000-00(429) would reconstruct SR 35/US 319 beginning at Magnolia Lane and terminating at GA/FLA Railroad Inc. in Colquitt County. The proposed project was subjected to an archaeological survey in July of 2001 by Teresa Lotti (HPD# HP010710-006).

Walker 2011
8347 Duff, Eric Anthony Archaeological Assessment of Project BRM-8013(9), Muscogee County

Project BRM-8013(9) would widen the existing bridge over Bull Creek on SR 22 Spur/Macon Road in Muscogee County.

Cherokee 2009
Displaying 401 - 410 of 695