Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
7304 Duff, Eric Anthony Archaeological Re-assessment of Project STP-001-6-(26), Gordon County

Project STP-00 1-6(26) would widen and reconstruct US 41/SR 3 in Gordon County. The proposed project on US 41 /SR 3 would begin at Chandler Street then continue northerly to an end point at the North Dalton Bypass/CR 379.

Putnam County, GA 2005
7306 Duff, Eric Anthony Archaeological Assessment of Project STP-018-1(71), Gordon County

Project STP-018-1(71) would construct turn lanes at the intersection of US 411/SR 61 and SR 136 in Gordon County. The proposed project on US 411/SR 61 would begin at M.P. 12.34 and end at M.P. 12.56. The proposed project on SR 136 would begin at M.P. 23.38 and end at M.P. 23.53.

Lowndes County, GA 1986
7308 Duff, Eric Anthony Archaeological Re-assessment of Project BHN-065-2(15), Gordon County

Project BHN-065-2 (15) would replace the structurally deficient bridge at Pine Log Creek on SR 53 in Gordon County. The proposed project would begin approximately 115 meters (377 feet) west and end approximately 110 meters (360 feet) east of the existing bridge structure.

Lowndes County, GA 1988
7310 Duff, Eric Anthony Archaeological Assessment of Project MLP-3(226), Gordon County

Project MLP-3 (226) would widen US 41 / SR 3 / North Wall Street in Calhoun, Georgia.

Lowndes County, GA 1995
7311 Duff, Eric Anthony Archaeological Assessment of Project BHN-065-2(15), Gordon County

The proposed project consists of the widening of the bridge at Pine Log Creek on SR 53 in Gordon County. The proposed project on SR 53 would begin approximately . 24 kilometer (.15 mile) west and end approximately . 24 kilometer (. 15 mile) east of the existing bridge structure.

Lowndes County, GA 1995
7313 Duff, Eric Anthony Archaeological Assessment of Project IM-75-3(189), Gordon County

The proposed project would reconstruct the I-75 bridges over SR 156 in Gordon County. The project also includes minor widening on SR 156 adjacent to I-75. The proposed project would begin approximately 120 meters (400 feet) west of I-75 then continue easterly on SR 156 ending at CR 483.

Walton County, GA 2001
7317 Duff, Eric Anthony Archaeological Assessment of Project STP-018-1(68), Gordon-Murray Counties

The proposed project consists of resurfacing on SR 61 in Gordon-Murray Counties. The project begins at mile post 11.85 in Gordon County and continues northerly to an end point at mile post 6.72 in Murray County for a total of 13.4 kilometers (8.30 miles).

Lumpkin County, GA 2002
7324 Duff, Eric Anthony Archaeological Assessment of Porject STP-004-3(37), Columbia/Richmond Counties, HP970516-001

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-004-3 (37), Columbia/Richmond Counties has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Histor

Muscogee County, GA 2013
7340 Duff, Eric Anthony Archaeological Assessment of Project IM-20-2 (155), Columbia Co.

The proposed project consists of building renovations and parking lot expansions at Rest Areas 62 and 63 in Columbia County. Rest Area 62 is located immediately south and adjacent to I-20 between CR 570 and SR 47.

Chatham County, GA 2012
7349 Duff, Eric Anthony Archaeological Assessment of Project NH-017-2(53)

Project NH-017-2(53) would add a center turn lane to US 27/SR 1 Polk County. The proposed project would begin at Hillside continue northeasterly to an end point just north of Frances Drive.

Paulding County, GA 2012
Displaying 381 - 390 of 695