3472 Pomfret, James Archaeological Survey of Project CSSTP-0007-00(515), Effingham County

This is an Archaeological Survey of Project CSSTP-0007-00(515) in Effingham County. The proposed project would improve the intersection of SR 21 and McCall Road. The proposed project would add an exclusive right turn lane with 250 foot of storage and a 100 foot taper on McCall Road.

Effingham County, GA 2006
3475 Pomfret, James A Summary Report of a Ground Penetrating Radar Survey at Hofwyl-Broadfield Plantation Historic Site, Georgia

On January 10, 2006 the Georgia Department of Transportation conducted a Ground Penetrating Radar (GPR) survey at the request of the Georgia Division of Natural Resources. Data were collected in two grids at the Hofwyl-Broadfield Plantation Historic Site (Figure 1).

Glynn County, GA 2006
3478 Pomfret, James Archaeological survey of New Griffen Area Office, Spalding County

This is an Archaeological Survey of New Griffin Area Office in Spalding County. The proposed project would construct a new Georgia Department of Transportation Area Office, approximately five miles east of the town of Griffin, Georgia.

Spalding County, GA 2006
3483 Pomfret, James A Summery Report of a Ground Penetrating Radar Survey at Mound A, Kolomoki State Park, Georgia

On June 13, 2005 the Georgia Department of Transportation conducted a Ground Penetrating Radar (GPR) survey at the request of the Georgia Department of Natural Resources, Historic Preservation Division. Two GPR survey grids were placed on top of Mound A at Kolomoki State Park(Figure 1).

Early County, GA 2005
3521 Pomfret, James Archaeological Survey of Project CSSRP-0007-00(006), Fayette County

This is an Archaeological Survey of Project CSSTP-0007-00(006) in Fayette County. The proposed project would improve the intersection of SR 85 at CR 126/Bernhard Road.

Fayette County, GA 2006
3523 Pomfret, James Archaeological Survey of Project CSSTP-M003-00(270), Glynn County

This is an Archaeological Survey of Project CSSTP-M003-00(270) in Glynn County. The proposed project would remove the existing toll plaza on the Torras Causeway. The proposed project would also resurface Torras Causeway from Mile Post 0.00 to Mile Post 3.95.

Glynn County, GA 2006
3527 Pomfret, James Archaeological Reevaluation of Project IM-NH-75-1(192), Bibb County

The proposed project would reconstruct the I-75/I-475/Hartley Bridge Road interchanges. The project would also widen Hartley Bridge Road from two lanes to four through lanes with turn lanes and a raised median from west of I-75 to east of the relocated Skipper Road.

Bibb County, GA 2006
3530 Pomfret, James Archaeological Survey of Projects STP-009-2(29) and BHF-009-2(91), Glynn County

The proposed project would extend the four lane intersection of SR 25/US 17 from Yacht Drive to Harry Driggers Boulevard for a distance of approximately 3.76 miles. The existing right-of-way along the corridor varies from 100 to 240 feet.

Glynn County, GA 2006
3575 Pomfret, James Archaeological Reevaluation of Project STP-037-2(62), Butts County

This is an Archaeological Reevaluation of Project STP-037-2(62), Butts County. The proposed project would construct two passing lanes along a 3.08 mile stretch of SR 42/US 23 between Jackson and Jenkinsburg. Site 1 is a northbound passing lane located between Mile Point (MP) 10.60 and MP 11.88.

Butts County, GA 2006
3579 Pomfret, James Archaeological Survey of Project IM-0000-00(689), Camden County

This is an Archaeological Survey of Project IM-0000-00(689) in Camden County. The proposed project would reconstruct the State of Georgia Welcome Center located on I-95 in Camden County.

Camden County, GA 2006