Ward, Jeanne A.

Report Number Author(s) Title Abstract Summary County Year
4356 Ward, Jeanne A. Phase 1 Cultural Resources Survey: Trade Center III

Greenhorne & O'Mara conducted a Phase I cultural resources investigation for Champion Partners within an approximately 32-acre tract located in Henry County, Georgia. Because the proposed construction will impact wetland already identified within the project area, a U.S.

Henry 1999
5902 Ward, Jeanne A. Georgia Feed 115/25 kV Substation, Randolph County, Georgia

GTC proposes to construct the Georgia Feed 115/25 kV Substation east of Cuthbert, Georgia in Randolph County (Figure 1). An archaeological survey was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended through 1992 (16 U.S.C. 470).

Randolph 1999
6937 Ward, Jeanne A. Phase I Cultural Resource Survey of the South Acworth 115/25 kV Substation Cobb County, Georgia

Georgia Transmission Corporation (GTC) proposes to construct the South Acworth 115/25 kV Substation next to an existing substation in South Acworth, Cobb County, Georgia. Greenhome & O'Mara, Inc.

Houston 1997
7331 Ward, Jeanne A. A Phase I archaeological Survey Cedarcrest 115/12 kV Substation and Transmission Line, Paulding County, Georgia

Georgia Transmission Corporation (GTC) proposes to construct the Cedarcrest 115/12 kV Substation and Transmission Line north of Dallas, Georgia in Paulding County. An archaeological survey was conducted in compliance with Section 106 of the National Historic

Cobb 2013
8492 Ward, Jeanne A., McCarthy, John P. A Phase I Archaeological Survey of the Chapel Hill Road 115/25 kV Substation

Georgia Transmission Corp. (GTC) proposes to construct the Chapel Hill Road 115/25 kV Substation south of Douglasville, Georgia. GTC must prepare a Borrower's Environmental Report and the project requires a US Army Corps of Engineers Section 404 permit.

Baker 2015