592
|
Rock, Carolyn, Ward, Jeanne A.
|
Archaeological Testing of Outlier a (9Cam168), Etowah Park (9Cam171ep), Harmony Hall (9Cam194), and Cedar Bluff (9Cam186)
|
This report presents the results of testing four archaeological sites on the Kings Bay Naval Submarine Base, Camden County, Georgia.
|
Camden
|
1983
|
635
|
Rock, Carolyn, Ward, Jeanne A.
|
An Archaeological Survey of a Portion of the Frohock Point Prehistoric Site (9Cam184) and the Mallard Creek Site (9Cam185)
|
An intensive archaeological survey was conducted along the southern edges of the Frohock Point Prehistoric Site (9CAM184) and the Mallard Creek Site (9CAM185), two adjacent multi-component prehistoric sites on the Naval Submarine Base, Kings Bay, Georgia.
|
Camden
|
1986
|
1933
|
Ward, Jeanne A.
|
Baker Highway - Langboard 115/25kV Transmission Line Coffee and Atkinson Counties and the College Avenue Substation, Pierce County
|
Georgia Transmission Corporation (GTC) proposes to construct the 17-mile long Baker Highway - Langboard 1 15/25 kV Transmission Line, which will begin south of the city of Douglas in Coffee County, Georgia and terminate south of Willacoochee in Atkinson County, Georgia, and the College Avenue Sub
|
Pierce
|
2000
|
1942
|
Ward, Jeanne A.
|
A Phase I Archaeological Survey of Pinetucky 46/25 kV Substation, Emanuel County, Georgia
|
GTC proposes to construct the Pinetucky 46/25 kV Substation northwest of Swainsboro, Georgia in Emanuel County (Figure 1). An archaeological survey was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended through 1992 (16 U.S.C. 470).
|
Emanuel
|
1999
|
2013
|
Ward, Jeanne A.
|
Phase I Archaeological Survey: Proposed Replacement of the Oconee River Bridge and Reconstruction of Route 46, Treutlen and Wheeler Counties, Georgia
|
Greenhorne & O'Mara, Inc., under contract to the Georgia Department of Transportation (GaDOT), conducted an archaeological survey of an approximately 4.5 mile-long (7.2 kilometer-long) corridor along a portion of Route 46 in Treutlen and Wheeler Counties, Georgia.
|
Treutlen
|
2000
|
4097
|
Ward, Jeanne A.
|
Douglas-Baker Highway 115/25 kV Substation and Transmission Line Coffee County, Georgia
|
Georgia Transmission Corporation proposes to construct the four-mile long Douglas - Baker Highway 115/25 kV Transmission Line and Baker Highway Substation located near the city of Douglas in Coffee County, Georgia.
|
Coffee
|
1999
|
4116
|
Ward, Jeanne A.
|
A Phase I Archaeological Survey, Highway 120 115/12 kV Substation and Transmission Line, Paulding County, Georgia
|
Georgia Transmission Corporation (GTC) proposes to construct the Highway 120 115/12 kV Substation and Transmission Line near Dallas, in Paulding County, Georgia (Figure 1). Greenhorne & O'Mara, Inc.
|
Paulding
|
1999
|
4133
|
Ward, Jeanne A.
|
A Phase 1 Cultural Resources Survey Big Springs 230/25 kV Substation Troup County, Georgia
|
Georgia Transmission Corporation proposes to construct the Big Springs 230/25 kV Substation southeast of LaGrange, Georgia in Troup County (Figure 1).
|
Troup
|
1999
|
4134
|
Ward, Jeanne A.
|
A Phase I Archaeological Survey Neyami 115/12 kV Substation, Lee County, Georgia
|
GTC proposes to construct the Neyami 115/12 kV Substation northwest of Leesburg, Georgia in Lee County (Figure 1). An archaeological survey was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended through 1992 (16 U.S.C. 470).
|
Lee
|
1999
|
4145
|
Ward, Jeanne A.
|
Rumble Road to Forsyth #2 115 kV Transmission Line, Monroe County, Georgia
|
Georgia Transmission Corporation (GTC) proposes to construct the Rumble Road to Forsyth #2 115 kV transmission line adjacent to an existing transmission line in Monroe County, Georgia (Figure 1). Greenhorne & O'Mara, Inc.
|
Monroe
|
2000
|