Back to top

Erickson, Luke W.

Report Number Author(s) Title Abstract Summary County Year
10744 Erickson, Luke W. Archaeological Assessment of the Forsyth County Resurfacing Project

Archeological Assessment of the Forsyth County Resurfacing Project.

Forsyth 2003
10750 Erickson, Luke W. Archaeological Assessment of the Hall County Resurfacing Project

Archeological Assessment of the Hall County Resurfacing Project. This proposed project is 9.138 miles in length and consists of leveling, resurfacing, shoulder building, permanent striping, and spot patching of SR 52 beginning at the Hall/Lumpkin County line and extending to SR 283.

Hall 2003
10752 Erickson, Luke W. Archaeological Assessment of a Carroll County Resurfacing Project

Archeological Assessment of a Carroll County Resurfacing Project. This proposed project consists of leveling, resurfacing, and shoulder building on SR 161166 beginning at Blandenburg Rd. (MP 15.560) and ending at Bankhead Hwy. (MP 18.739), a total project length of 2.379 miles.

Carroll 2004
10753 Erickson, Luke W. Archaeological Assessment of a Bibb/Jones Counties Resurfacing Project

Archeological Assessment of a Bibb/Jones Counties Resurfacing Project. This project consists of milling, leveling, resurfacing, and shoulder building on SR 11, beginning at M.P. 12.51 in Bibb County and ending at M.P. 9.60 in Jones County.

Bibb 2005
10754 Erickson, Luke W. Archaeological Assessment of a Lumpkin County Resurfacing Project

Archeological Assessment of a Lumpkin County Resurfacing Project. This proposed project consists of the milling, leveling and resurfacing on SR 52 beginning at M.P. 14.93 and ending at the Lumpkin/Hall County Line (M.P. 24.73).

Lumpkin 2005
10755 Erickson, Luke W. Archaeological Assessment of a Crisp/Worth County Resurfacing Project

Archeological Assessment of a Crisp/Worth County Resurfacing Project. This project proposes to mill, level and resurface SR 300 beginning southwest of its intersection with SR 313 in Worth County and ending north of CR 224 in Crisp County.

Crisp 2005
10761 Erickson, Luke W. Archaeological Assessment of a Carroll/Paulding County Resurfacing Project

Archeological Assessment of a Carroll/Paulding County Resurfacing Project. This proposed project consists of the resurfacing, milling, and grading of SR 101 starting at SR 78 in Carroll County and ending at SR 120 in Paulding County. Total project length is 8.91 miles.

Carroll 2005
10762 Erickson, Luke W. Archaeological Assessment of a Haralson County Road Improvement Project

Archeological Assessment of a Haralson County Road Improvement Project. This project consists of the milling and resurfacing of SR 120 beginning at SR 100 (M.P. 0.00) and ending at SR 1 (M.P. 8.83). All work will take place within the existing right-of-way, with no new right-of-way required.

Haralson 2005
10765 Erickson, Luke W. Archaeological Assessment of a Wilkinson County Resurfacing Project

This project proposes the milling, resurfacing, leveling, patching, and shoulder building of SR 112 beginning at US 441 and ending at SR 57. All work will take place will run the existing right-of-way with no new right-of-way required. Total project length is approximately 11.35 miles.

Wilkinson 2006
10766 Erickson, Luke W. Archaeological Assessment of a Lanier County Resurfacing Project

Archeological Assessment of a Lanier County Resurfacing Project. This project proposes improvements to US 129/SR 11 beginning at the US 84/SR 38 intersection (M.P. 5.30) and ending approximately 70' south of the SR 31 intersection (M.P. 13.55). the proposed improvements are as follows:

Lanier 2005
Displaying 291 - 300 of 504