Back to top

Erickson, Luke W.

Report Number Author(s) Title Abstract Summary County Year
11191 Erickson, Luke W. Archaeological Assessment of a Hall County Resurfacing Project

Archeological Assessment of a Hall County Resurfacing Project. This proposed project begins on SR 11 Business at SR 60 (MP .96) and ends at MP 3.17 in Hall County and consists of 2.2 miles of milling and inlay. No new right-of-way is required.

Hall 2004
11192 Erickson, Luke W. Archaeological Assessment of the Jackson County Resurfacing Project

Archeological Assessment of the Jackson County Resurfacing Project.

Jackson 2004
11201 Erickson, Luke W. Archaeological Assessment of a Jackson County Resurfacing Project

Archeological Assessment of a Jackson County Resurfacing Project. This project consists of 1.65 miles of resurfacing on SR 11 beginning at the Pendergrass Bypass and ending at the Hall County Line. Raised Pavement markers and patching will be handled by the contractor.

Jackson 2004
11206 Erickson, Luke W. Archaeological Assessment of a Bibb County Bridge Deck Resurfacing Project, CSNHS-M002-00(784)

Archeological Assessment of a Bibb County Bridge Deck Resurfacing Project. This project consists of the hydro-demolition of deck surfaces for 8 bridges on I-75 in Bibb County, Georgia.

Bibb 2005
11210 Erickson, Luke W. Archaeological Assessment of a Bartow/Gordon County Bridge Deck Project

Archeological Assessment of a Bartow/Gordon County Bridge Deck Project. This project proposes to perform maintenance to five GDOT bridges on I-75 located in Bartow and Gordon Counties, Georgia.

Bartow 2005
11213 Erickson, Luke W. Archaeological Assessment of a Towns County Resurfacing Project, CSSTP-M003-00(442)

Archeological Assessment of a Towns County Resurfacing Project. This project consists of the patching, leveling, overlay, permanent markings, and shoulder building of SR 288 from M.P. 0.00 to M.P. 5.76. All work will take place within the existing right-of-way with no new right-of-way required.

Towns 2006
11280 Erickson, Luke W. Archeological Assessment of the Union County Resurfacing Project

Archeological Assessment of the Union County Resurfacing Project. This proposed project is 1.26 miles in length and consists of resurfacing SR 11 beginning 0.10 mile south of Shoe Factory Road (MP 12.39) and ending at SR 515 (MP 13.65). No additional right-of-way is required.

Union 2003
11493 Erickson, Luke W. Archaeological Assessment of a Madison County Resurfacing Project (CSSTP-M003-00(361))

This proposed project consists of the leveling and resurfacing of SR 106 from SR 8 to SR 98. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 10.06 miles.

Madison 2005
11494 Erickson, Luke W. Archaeological Assessment of a Union County Resurfacing Project (CSSTP-M003-00(362))

This proposed project consists of the milling and resurfacing of SR 11 beginning at its intersection with SR 515 and ending at the North Carolina State Line. All work will take place within the existing right-of-way with no new right-of-way required.

Union 2005
11496 Erickson, Luke W. Archaeological Survey of Project CSNHS-M003-00(585), Chatham County

In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendment thereto, project CSNHS-M003-00(584), Chatham County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic Places

Chatham 2006
Displaying 411 - 420 of 504