2995
|
Erickson, Luke W.
|
Archeological Survey of project CSSTP-0007-00(120), Fulton County
|
This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 33 intersections along SR 140/SR 9/Holcomb Bridge Road/Crossville Road from River Exchange to Steeple Run/Wildwood Road.
|
Fulton
|
2005
|
2996
|
Erickson, Luke W.
|
Archeological Survey of project CSSTP-0007-00(114), Cobb County
|
This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 16 intersections along SR 8/Veteran's Memorial Highway from Jefferson Street to Discovery Boulevard.
|
Cobb
|
2005
|
2997
|
Erickson, Luke W.
|
Archeological Survey of project CSSTP-0007-00(115), Fulton County
|
This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 9 intersections along SR 154/Campbellton Road from 1-285 to Suber/Union Road.
|
Fulton
|
2005
|
3007
|
Erickson, Luke W.
|
Archeological Survey of Project BRST-0524(9), Calhoun County
|
This project proposes to replace the bridge on SR 234 over Chickasawhatchee Creek, 8 miles northeast of the City of Leary, Calhoun County, Georgia. The existing 352'x26' concrete bridge will be replaced with a 400'x40' concrete bridge on new alignment south of the existing bridge.
|
Calhoun
|
2005
|
3009
|
Erickson, Luke W.
|
Archeological Survey of project CSSTP-0007-00(116), Cobb County
|
This project proposes to upgrade the traffic signal equipment on SR 280/South Cobb Drive from 1-285 to Pat Mell Road. The intersections involved will be all intersections within the termini that have existing signals.
|
Cobb
|
2005
|
3015
|
Erickson, Luke W.
|
Archaeological Survey of Project CSMSL-0006-00(258), Chattahoochee County
|
This project proposes to install radar devices, pavement loops, and overhead LED signs for the purpose of detecting and informing motorists of their speed as they approach the intersection of SR 520 at SR 1.
|
Chattahoochee
|
2005
|
3019
|
Erickson, Luke W.
|
Archeological Reassessment of Project BRST-563(9), Thomas County
|
The original project was surveyed and concurrence received in July 2003. This project consists of replacing the existing bridge on SR 33 over Reedy Creek south of Pavo, Georgia.
|
Thomas
|
2005
|
3020
|
Erickson, Luke W.
|
Archeological Survey of project PESTP-0007-00(239), Fulton County
|
This project proposes to improve the southbound exit ramp from SR 400 to SR 140/Holcomb Bridge Road, Fulton County, Georgia. The existing 16' ramp will be widened to 36' by the addition of 20' of PCC pavement along the entire length of the right side of the exit ramp.
|
Fulton
|
2005
|
3021
|
Erickson, Luke W.
|
Archeological Reassessment of project STP-0754(9), Spalding County
|
This project was originally surveyed and concurrence received in April 2000, then reevaluated with concurrence received in January 2002. The original project proposed to construct four passing lanes along SR 155 in Spalding County.
|
Spalding
|
2005
|
3032
|
Erickson, Luke W.
|
Archeological Survey of project BRST-0531(8), Randolph County
|
This project proposes to replace and relocate the existing bridge on SR 266 over the Georgia Southwestern Railroad, 2 miles west of the City of Cuthbert, Randolph County, Georgia.
|
Randolph
|
2005
|