Back to top

Erickson, Luke W.

Report Number Author(s) Title Abstract Summary County Year
2995 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(120), Fulton County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 33 intersections along SR 140/SR 9/Holcomb Bridge Road/Crossville Road from River Exchange to Steeple Run/Wildwood Road.

Fulton 2005
2996 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(114), Cobb County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 16 intersections along SR 8/Veteran's Memorial Highway from Jefferson Street to Discovery Boulevard.

Cobb 2005
2997 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(115), Fulton County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 9 intersections along SR 154/Campbellton Road from 1-285 to Suber/Union Road.

Fulton 2005
3007 Erickson, Luke W. Archeological Survey of Project BRST-0524(9), Calhoun County

This project proposes to replace the bridge on SR 234 over Chickasawhatchee Creek, 8 miles northeast of the City of Leary, Calhoun County, Georgia. The existing 352'x26' concrete bridge will be replaced with a 400'x40' concrete bridge on new alignment south of the existing bridge.

Calhoun 2005
3009 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(116), Cobb County

This project proposes to upgrade the traffic signal equipment on SR 280/South Cobb Drive from 1-285 to Pat Mell Road. The intersections involved will be all intersections within the termini that have existing signals.

Cobb 2005
3015 Erickson, Luke W. Archaeological Survey of Project CSMSL-0006-00(258), Chattahoochee County

This project proposes to install radar devices, pavement loops, and overhead LED signs for the purpose of detecting and informing motorists of their speed as they approach the intersection of SR 520 at SR 1.

Chattahoochee 2005
3019 Erickson, Luke W. Archeological Reassessment of Project BRST-563(9), Thomas County

The original project was surveyed and concurrence received in July 2003. This project consists of replacing the existing bridge on SR 33 over Reedy Creek south of Pavo, Georgia.

Thomas 2005
3020 Erickson, Luke W. Archeological Survey of project PESTP-0007-00(239), Fulton County

This project proposes to improve the southbound exit ramp from SR 400 to SR 140/Holcomb Bridge Road, Fulton County, Georgia. The existing 16' ramp will be widened to 36' by the addition of 20' of PCC pavement along the entire length of the right side of the exit ramp.

Fulton 2005
3021 Erickson, Luke W. Archeological Reassessment of project STP-0754(9), Spalding County

This project was originally surveyed and concurrence received in April 2000, then reevaluated with concurrence received in January 2002. The original project proposed to construct four passing lanes along SR 155 in Spalding County.

Spalding 2005
3032 Erickson, Luke W. Archeological Survey of project BRST-0531(8), Randolph County

This project proposes to replace and relocate the existing bridge on SR 266 over the Georgia Southwestern Railroad, 2 miles west of the City of Cuthbert, Randolph County, Georgia.

Randolph 2005
Displaying 71 - 80 of 504