Pietak, Lynn Marie
|
Phase I Cultural Resource Survey for the Center Point- Swamp Creek Transmission Line, Whitfield County, Georgia
|
TRC conducted a Phase I cultural resources survey for the proposed Center Point-Swamp Creek transmission line project in Whitfield County, Georgia, south of Dalton, on July 12 and 13, 2001. The project was undertaken for the TVA.
|
Whitfield
|
2002
|
2591
|
Duff, Eric Anthony, Pietak, Lynn Marie
|
Addendum To: Phase I Archaeological Survey of Mt. Vernon Highway Side walks Project Area, Fulton County, Georgia
|
The project would consist of the construction of a five-foot wide concrete sidewalk within existing shoulders along the south side of Mt. Vernon Highway from Powers Ferry Road to Lake Forrest Drive.
|
Fulton
|
2004
|
2595
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Rogers Bridge Rd Between Bell Road and the Chattahoochee River, Fulton County, Georgia
|
A multi-use trail is to be constructed along the west side of this portion of Rogers Bridge Road, between Bell Road and the Chattahoochee River. The existing right-of-way on Rogers Bridge Road is 30 feet.
|
Fulton
|
2003
|
2597
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Thirteen Signal System Upgrade Locations and Cable and Conduit Installation Right of Way in the City of Albany, Dougherty County, Georgia
|
On September 4, 2003, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of thirteen signal system upgrade locations in the City of Albany, Dougherty County, Georgia.
|
Dougherty
|
2004
|
2600
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Two Intersection Improvements: State Route 125/Bemiss Road at County Road 784/Northside Deive and State Route 133/St. Augustine Rd at County Road 485/River Street, Lowndes County, Georgia
|
In August 2003, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed intersection improvements at two locations, State Route 125/Bemiss Road at Northside Drive and State Route 133/St. Augustine Road at River Street in Lowndes County, Georgia.
|
Lowndes
|
2003
|
2606
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Intersection Improvements at SR 5 Connector/Barrett Parkway with CR 6798/Cobb Place Blvd/Costco Dr, Cobb County, Georgia
|
In October 2003, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed intersection improvements at State Route (SR) 5 Connector/Barrett Parkway with CR 6798/Cobb Place Boulevard/Costco Drive in Cobb County, Georgia.
|
Cobb
|
2003
|
2609
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Perimeter Center Parkway Project Area, Dekalb County, Georgia
|
The proposed projects would consist of designing a 28-40 foot wide landscaped median to replace the existing 8-20 foot wide raised median along Perimeter Center Parkway from Hammond Drive to Perimeter Center West Parkway.
|
DeKalb
|
2003
|
2612
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Mt. Vernon Highway Sidewalks Project Area, Fulton County, Georgia
|
The proposed project area is the south side of Mt. Vernon Highway, from Powers Ferry Road to Roswell Road. The project would consist of the construction of a five-foot wide concrete sidewalk within existing shoulders along the south side of Mt.
|
Fulton
|
2003
|
2615
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Perimeter Center West Improvements, Dekalb and Fulton Counties, Georgia
|
The following includes highlights of five proposed projects along Perimeter Center West from Ashford-Dunwoody Road to Mt. Vernon Highway: Provide streetscape improvements including new sidewalks, street lights, landscaping, and improving pedestrian access.
|
Fulton
|
2004
|
2617
|
Pietak, Lynn Marie
|
Phase I Archaeological Suvey of ITS Enchancement, Phase 3, Traffic Signal Timing System Installation, Cobb County, Georgia
|
This project would install an adaptive traffic signal timing system in 69 traffic signals within the Cumberland CID area. The installation of video detection and replacement of traffic signal cabinets and controllers is also included.
|
Cobb
|