Back to top

Pietak, Lynn Marie

Report Number Sort ascending Author(s) Title Abstract Summary County Year
12375 Pietak, Lynn Marie, Bottomley, Blake PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT ON SR 42 OVER THE SOUTH FORK OF PEACHTREE CREEK, BRIDGE NO. 089-0027-0, DEKALB COUNTY, GEORGIA

The following chapters report the findings of the 2018 archaeological survey.

DeKalb 2019
12319 Duff, Eric Anthony, Pietak, Lynn Marie Addendum to Phase I Archaeological Survey for a Proposed Road Widening at the Intersection of State Route 16 and CR 55/Wilson Road, Spalding County, Georgia

Previously. right-of-way acquisition was limited to miters at each quadrant of the intersection. A 25-foot wide and 330-foot-long strip of additional right-of-way was also required along the south side of SR 16. west of CR 55. No right-of-way was required along either side of CR 55.

Spalding 2004
12296 Pietak, Lynn Marie, Bottomley, Blake PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT ON SR 42 OVER THE SOUTH FORK OF PEACHTREE CREEK, BRIDGE NO. 089-0027-0, DEKALB COUNTY, GEORGIA

In May 2018, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed bridge replacement on State Route (SR) 42 over the South Fork of Peachtree Creek in DeKalb County, Georgia.

DeKalb 2019
12148 Pietak, Lynn Marie Phase I Archaeological Survey for the I-85 Southbound Bridge (No. 157-0049-0) and I-85 Northbound Bridge (No. 157-0048-0) @ CR 296/ Ridgeway Church Road, Jackson County, Georgia

GDOT proposes to replace the two bridges that carry 1-85 over Ridgeway Church Road, which are located approximately 1.3 miles southwest of the l-851nterchange with U.S. Route 441 and 3.3 miles outside of the city or Commerce.

Jackson 2018
12140 Pietak, Lynn Marie, Silliman, Garrett W. Phase I Archaeological Survey of Gateway Bridge and Approach Path Locations, Peachtree City, Fayette County, Georgia, STP-0004-00(483)

The proposed project would involve the construction of a steel bridge with a minimum clear-span width of 12 feet that would extend from the south side of SR 54 to the north side of SR 54, a two-lane highway which is currently being widened into 4 lanes. The existing r/w is 200 ft.

Fayette 2006
12133 Pietak, Lynn Marie, Hitt, Kaitlen Phase I Archaeological Survey for the I-985 @ CS 991/ Elachee Road Bridge # 139-0055-0, Hall County, Georgia.

The project proposes to replace the structurally deficient bridge that carries Elachee Drive over 1-985 northbound and southbound and is located between the city of Gainesville and the town of Oakwood. Existing Georgia Department of Transportation (GDOT) Bridge No.

Hall 2018
11840 Pietak, Lynn Marie Phase I Archaeological Survey to Replace GDOT Bridge 003-0012-0 on SR 64 over Satilla River, Atkinson County, Georgia

The proposed project would consist of the replacement of GDOT Bridge 003-0012-0 on State Route (SR) 64 over the Satilla River approximately 6 miles northeast of Pearson in Atkinson County.

Atkinson 2018
10986 Pietak, Lynn Marie Second Addendum to the Phase I Archaeological Survey for Mt. Zion Boulevard/Battle Creek Road Widening, Clayton County, Georgia

Pl751770: The construction consists of widening Battle Creek Road and Mt. Zion Boulevard from Southlake Parkway to Somerton Drive from the existing two and four lane facilities to four. 11 ' lanes with a 20' raised median and urban shoulders consisting of 2.5' curb and gutter, and 5' sidewalks.

Clayton 2018
10936 Pietak, Lynn Marie Phase I Archaeological Survey for the SR 38/US 84 Bridge 299-0013-0 over the Satilla River, located in Ware and Pierce Counties, Georgia

The proposed project would consist of the replacement of GDOT Bridge 299-0013-0 on State Route (SR) 38/United States Highway 84 (Plant Avenue Extension) over the Satilla River in Sunnyside, approximately 2.5 miles northeast of Waycross in Ware and Pierce Counties, Georgia (Figure 1 ).

Ware 2018
10325 Pietak, Lynn Marie Phase I Archaeological Survey of the Bridge Replacement of SR 212 at Lake Jackson

Georgia Department of Transportation (GDOT) Project P.I. No. 0013603 in Newton County would replace the existing two-lane bridge on State Route (SR) 212 over Lake Jackson, approximately 13.9 miles south of Covington, Georgia.

Newton 2018
Displaying 21 - 30 of 538