9166
|
Quirk, Phillip W., Pietak, Lynn Marie
|
Addendum to Phase I Survey of the I-75/SR 401 Widening from SR 155 to SR 138, Henry Co., GA
|
This addendum addresses the improvements associated with the Walt Stephens Road Bridge over 1-75 as described in the attached project description.
|
Fulton
|
0
|
9165
|
Pietak, Lynn Marie
|
Addendum to Archaeological Survey of I-20 Eastbound Improvements from Columbia Dr. to Panola Road, DeKalb County, Georgia
|
The proposed project consists of an operational improvement on I-20 Eastbound in DeKalb County in the vicinity of the I-20/I-285 interchange, from approximately the I-20/Columbia Drive interchange to the I-20/Panola Road interchange, for a total distance of approximately 4.5 miles.
|
Pulaski
|
2001
|
9163
|
Pietak, Lynn Marie, Blackwelder, Jon R.
|
Phase I Archaeological Survey of US 41/US 76/SR 3/North Dalton Bypass at SR 71 Intersection Improvement, Whitfield County, Georgia
|
The proposed project is located on the north side of Dalton in Whitfield County, Georgia. The project would involve intersection improvements to US 41/US 76/SR 3/North Dalton Bypass and SR 71/Cleveland Highway.
|
Lowndes
|
1959
|
9147
|
Pietak, Lynn Marie
|
2nd Addendum to Ph. I Arch. Survey of Proposed ATMS Installation and Signal Upgrades
|
Please see attached sheets for original and first addendum project descriptions. Current description: Changes to the Clayton County ATMS project would occur at only two intersections.
|
Cherokee
|
2005
|
9145
|
Pietak, Lynn Marie
|
Phase I Arch. Survey of Klondike Road Sidewalks Project Corridor, DeKalb County, GA
|
The project would encompass the intersection of Klondike Road and S. Goddard Road in the southeast corner of DeKalb County, Georgia. The project limits on Klondike Road would begin approximately 1,610 feet (0.30 mile) south and end approximately 430 (0.08 mile) north of its intersection with S.
|
Webster
|
2015
|
9143
|
Pietak, Lynn Marie
|
Addendum to Ph. I Arch Survey of the Kennesaw Mountain to the Chattahoochee River Trail
|
The proposed project would construct a 10-foot (desirable) to 8-foot (minimum) multi-use concrete path along the project corridor, as described below.
|
Mitchell
|
2015
|
9139
|
Pietak, Lynn Marie
|
Phase I Arch. Survey of US 41/US 76/SR 3/North Dalton Bypass at SR 71, Whitfield County
|
The proposed project is located on the north side of Dalton in Whitfield County, Georgia. The project would involve intersection improvements to US 41/US 76/SR 3/North Dalton Bypass and SR 71/Cleveland Highway.
|
Colquitt
|
2015
|
9137
|
Pietak, Lynn Marie
|
Adden. to Phase I Survey for the Proposed Bridge Replacement at CR 467 at Cane Creek
|
The proposed project is located on CR 467/Bickley Highway at the crossing of Cane Creek in Ware County, Georgia. The proposed project would begin approximately 1,230 feet west of the bridge and end approximately 1,270 feet east of the bridge.
|
Cherokee
|
2001
|
9136
|
Carbo, Andrew, Moss, Richard A., Pietak, Lynn Marie
|
Phase I Archaeological Survey Of The Proposed SR 42 Spur/McDonough Boulevard SE Bridge Over The Norfolk Southern Railroad, Fulton County, Georgia
|
Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed bridge replacement at State Route (SR) 42 Spur/McDonough Boulevard over the Norfolk Southern Railway in Fulton County, Georgia (Georgia Department of Transportation [GDOT] P.I. No.
|
Fulton
|
1987
|
8928
|
Pietak, Lynn Marie
|
Addendum to the Phase I Archaeological Survey Of Interchange Improvements at South Atlanta Road, Cobb County, Georgia
|
The original project description, as shown above, has not changed. However, as part of final design, areas of permanent and driveway easement have been added to the project.
|
Fulton
|
2013
|