Back to top

Raymer, Leslie E.

Report Number Author(s) Title Abstract Summary County Year
987 Cable, John S., Raymer, Leslie E. Archaeological Test Excavations at the Lake Acworth Site (9Co45) and the Butler Creek Site (9Co46) Allatoona Lake, Cobb County, Georgia

Between July 23rd and August 16th, 1990, New South Associates, Inc. conducted archeological test excavations on two prehistoric sites (9Co45 and 9Co46) within the public use area of Allatoona Lake. The project was sponsored by the Mobile Corps of Engineers (Contract Number DACW01-90-C-0144).

Cobb 1991
1184 Cable, John S., Raymer, Leslie E. Archeological Excavations at the Lake Acworth Site (9CO45): a Palisaded Mississippian Village in the Upper Piedmont of Northwest Georgia

Between November 14 and December 13, 1991, New South Associates conducted archeological data recovery excavations at the Lake Acworth Site (9Co45), a palisaded Mississippian village now located within the lands leased to Cobb Country, Georgia, at Allatoona Lake, Georgia.

Cobb 1994
1303 Cantley, Charles E., Raymer, Leslie E. Phase I Archaeological Survey of the North River Causeway, Camden County, Georgia

New South Associates of Stone Mountain, Georgia, conducted a Phase I cultural resources survey within the North River Causeway project corridor between April 6 and April 8, 1994.

Camden 1994
1343 Guan, Garry X., Raymer, Leslie E. Archaeological Testing and Evaluation of Ten Sites in the Proposed Horton Creek Reservoir, Fayette County, Georgia

This report documents the results of the Phase II archeological testing of ten sites, 9FY77, 9FY80, 9FY82, 9FY83, 9FY84, 9FY86, 9FY94, 9FY106, 9FY108, and 9FY116, that are within the impact zone of the proposed Horton Creek Reservoir project, Fayette County, Georgia.

Fayette 1995
1653 Raymer, Leslie E., Hamby, Theresa M. Phase I Archaeological Survey of Haddock Road, Camden County, Georgia

New South Associates conducted a Phase I archaeological survey of Haddock Road in Camden County between July 2 and 3, 1997. The survey corridor is approximately 2 miles long with an 80 foot right-of-way, 40 feet on either side of the centerline.

Camden 1997
1825 Joseph, Joseph W., Raymer, Leslie E. Prehistoric and Historic Excavations at Site 9GW347, Gwinnett County, Georgia

This report represents the results of historic documentation and archaeological data recovery excavations at Site 9Gw347, the Annistown Mills Site, located on the Yellow River in Gwinnett County.

Gwinnett 1998
2089 Loubser, Johannes H. N., Raymer, Leslie E. Data Recovery at 9JK173 Bear Creek Reservoir, Jackson County, Georgia

Phase 1II block excavations and machine stripping at site 9Jk173 -- within the proposed impoundment area of the Bear Creek Water Supply Reservoir of southwestern Jackson County -- yielded evidence for a single Late Cartersville ceramic component.

Jackson 1999
2115 Cantley, Charles E., Raymer, Leslie E. Phase II Archaeological Investigations at Three Sites in Paulding County, Georgia: The Neighborhoods of Pumpkinvine Creek Project

During April, 1998, New South Associates conducted Phase II test excavations at three potentially eligible sites in the Neighborhoods of Pumpkinvine Creek Tract, Paulding County, Georgia.

Paulding 1998
5577 Cantley, Charles E., Raymer, Leslie E. Phase III Data Recovery at Four Prehistoric Sites in the Horton Creek Reservoir Project Area

Archaeological Investigations at four prehistoric sites along Horton Creek in Fayette County, Georgia are summarized.

Fayette 1995
8102 Keith, Scot J., Raymer, Leslie E., Davis, Valerie, Severts, Patrick, Seramur, Keith C. Phase III Archaeological Data Recovery Mitigation of 9GO297

The Georgia Department of Transportation (GDOT) plans to realign State Road (SR) 225 in conjunction with the replacement of structurally deficient bridges located on SR 225 over New Town Creek and the Coosawattee River in Gordon County, Georgia.

Walker 2012
Displaying 1 - 10 of 11