Report Number Author(s) Title Abstract Summary County Year
2325 Joseph, Joseph W., Edwards, Matthew J. Phase I Archaeological Survey of the Jennings Mill Parkway Extension, Oconee County, Georgia

New South Associates conducted a Phase I archaeological survey of the Jennings Mill Parkway Extension project in Oconee County, Georgia. The proposed corridor is approximately 2.5 miles in length and includes about 100 feet of right-of-way.

Oconee 2002
2368 Loubser, Johannes H. N., Edwards, Matthew J. Intensive Archaeological Field Survey of the Reedy Creek Bridge Replacement, Wayne County, Georgia

A two-person crew of New South Associates, Inc. conducted a survey of the Reedy Creek Bridge replacement on June 6, 2002.

Wayne 2002
2470 Loubser, Johannes H. N., Edwards, Matthew J. Phase I Cultural Resource Survey of US 84/SR 38 Alternates, Clinch and Ware Counties, Georgia

The following report details New South Associates' archaeological survey of three alternate routes proposed for a highway-widening project along Highway US 84/SR 38 in March of 2003.

Clinch 2003
2488 Joseph, Joseph W., Edwards, Matthew J. Phase I Archaeological Survey for the I-20/Three Points Road Interchange

New South Associates conducted a Phase I archaeological survey of the proposed interchange at the intersection of Interstate 20 and Three Points Road on April 1, 2003.

McDuffie 2003
13498 Edwards, Matthew J., Hamby, Theresa M., Joseph, Joseph W. Phase I Archaeological Survey of the South Cobb Drive Sidewalk Project, Cobb County, Georgia, GDOT Project CM-0000-00(628)

New South Associates conducted a Phase I archaeological survey of the proposed sidewalk project along South Cobb Drive on April 18, 2003.

Cobb 2003