Report Number Author(s) Title Abstract Summary County Year
6708 Joseph, Joseph W., Tankersley, Matthew Phase 1 Archeological Survey of Seven Acres for a Recreational Trail at the Battle of Brown's Mill

New South Associates conducted a Phase I Archaeological Survey of approximately seven acres for the location of a recreational trail within the Battle of Brown's Mill historic site. Thirty-six shovel test pit locations were investigated at a 30-meter (100-ft.) interval.

Forsyth 2003
6861 Joseph, Joseph W., Tankersley, Matthew Phase I Archaeological Survey of the Toomsboro Tract Wilkinson County, Georgia

New South Associates conducted a Phase I archaeological survey of a tract located approximately 0 .4 miles northwest of Toomsboro, Georgia totaling approximately 75 acres.

Coffee 1991
7430 Botwick, Brad, Tankersley, Matthew Phase I Archaeological Survey of the SR 45 Bridge Replacements at Cordray's Mill, Calhoun County, Georgia

Two bridges (Structures 037-0015-0 and 037-0016-0) are planned for replacement on SR 45 at Cordray's Pond between Mileposts 16.52 and 17.30 in Calhoun County, Georgia (GDOT PI No. 0009862, HP# 110531-008).

Liberty 2012
7474 Joseph, Joseph W., Tankersley, Matthew Phase I Archaeological Survey of SR 154/SR 166 at CR 1386/Stonewall Tell Road, Fulton County, Georgia

The proposed safety project to improve the intersection skew angle and sight distance of the intersection of SR 154/SR 166 Campbellton Road and Stonewall Tell Road is located in Fulton County, approximately nine miles west of East Point, Georgia.

Fulton 2002
7603 Joseph, Joseph W., Tankersley, Matthew Cultural Resource Survey and Phase II Archaeological Testing of 9CH1191 on Alternative 4 of the Brampton Road Connector

The Georgia Department of Transportation (GDOT) plans to realign Brampton Road in Garden City, Chatham County Georgia.

Henry 1986
7826 Tankersley, Matthew, Keith, Scot J. Phase I Archaeological Survey for Intersection Improvements at S.R. 22/U.S. 80 at C.R. 33/Holley Road

The project would replace the current intersection between S.R. 22 and Holley Road with a roundabout. The proposed project includes a corridor extending 2,400 feet along S.R. 22 and 600 feet on Holley Road, both centered on the intersection. The S.R.

Clayton 2001
7980 Joseph, Joseph W., Tankersley, Matthew, Valk, Diana, Ciomek, Summer Phase I Survey and Archaeological Testing of the Bridge Replacement at SR 216 over Ichawaynochaway Creek
Johnson 2013
8556 Joseph, Joseph W., Meader, J. Faith, Tankersley, Matthew The Spier House Architectural History and Archaeology of An Antebellum House Site

This report presents the results of an architectural historical documentation and archaeological data recovery of Site 9FU411, the Spier House, conducted by New South Associates, Inc. Fieldwork for this project took place in May, September, and October of 2004.

Stephens 2010
8578 Joseph, Joseph W., Tankersley, Matthew Phase I Archaeological Survey of the Proposed Runway Extension of the Jackson County Airport, Jefferson, Georgia

New South Associates conducted a Phase I archeological survey of the proposed runway extension of the Jackson County Airport on January 2, 2007. The proposed extension would lengthen the existing runway I ,000 feet to the north of its current termination point.

Catoosa 2015
8743 Joseph, Joseph W., Tankersley, Matthew, Lowry, Sarah Geophysical Survey and Phase II Archaeological Testing of 9ME1402 Muscogee County, Georgia

Georgia Department of Transportation (GDOT) archaeologists identified site 9ME1402 during survey at 1311 Warm Springs Road (Parcel 30) in Columbus, Georgia.

Bulloch 2011
Displaying 11 - 20 of 24