Back to top

McIntosh, Paul

Report Number Author(s) Title Abstract Summary County Year
6301 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project STP-001-5(60), Cobb County

The original proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Cobb County. The project begins approximately 1.12 miles within the city limits of Kennesaw extending northward to the Bartow County Line.

Cobb County, GA 1982
6335 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project STP-001-5(60) Cobb County

The proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Cobb County. The project begins approximately 1.12 miles within the City Limits of Kennesaw extending northward to the Bartow County Line.

Cobb County, GA 1979
6472 McIntosh, Paul Archaeological Assessment of Project BHF-062-1(22), Emanuel County

The proposed project would consist of replacing the bridge spanning Sardis Creek along SR 57 in Emanuel County. The existing bridge is a 23.7-foot X 200-foot concrete and steel structure, and will be replaced with a 40-foot X 200-foot concrete and steel structure on existing alignment.

Clayton County, GA 1977
6480 McIntosh, Paul Archaeological Assessment of Project STP-1588(3), Forsyth County

The proposed project would reconstruct the intersection of SR 371 and CR 5 in Forsyth County. Turn lanes will be added to SR 371 north and southbound, and CR Swill be relocated to allow for proper alignment at the intersection.

Clinch County, GA 1997
6493 McIntosh, Paul Archaeological Assessment of Project MLP-0001-00(980), Forsyth County

The proposed project would widen SR 369 between SR 9 and SR 400 by an additional lane. The existing right-of-way along SR 369 is approximately 100 feet. All project construction would be take place within existing right-of-way.

Cobb County, GA 1996
6506 McIntosh, Paul Archaeological Assessment of Project PR-8530(109), Evans County

Project PR-8530(109) consists of construction of concrete curb and gutter on B. Sands Street, River Bridge Road, West Main Street and East Main Street in the city of Daisy in Evans County. Construction will be within the existing right-of-way.

Cobb County, GA 1998
6515 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Projects EDS-545(49)(43), Jefferson, Warren, and McDuffie Counties

The original proposed project would widen and reconstruct SR 17 from the intersection of CR 59/Quaker Road in Jefferson County, ending at CR 311/Wire Road in McDuffie County.

Paulding County, GA 1985
6528 McIntosh, Paul Archaeological Assessment of Project BRSLB-9110(4), Clayton County

The proposed project would consist of replacing the bridge spanning Little Cotton Indian Creek along CR 1351/Rex Road in Clayton County. The bridge will be replaced on new location, approximately 540 feet downstream of the existing structure.

Fulton County, GA 2002
6532 McIntosh, Paul Archaeological Assessment of Project BRF-001-4(57), Clayton County

The proposed project would consist of replacing the bridge spanning the Central of Georgia Railroad along US 19/SR 3/ Old Dixie Highway in Clayton County. The existing bridge is a 350' X 52.2' concrete structure, and will be replaced with a 350' X 66' concrete structure on existing alignment.

Cobb County, GA 1995
6533 McIntosh, Paul Archaeological Assessment of Project CM-75-2(214), Clayton County

The proposed project consists of expansion of the NAVIGATOR system on 1-75 in Clayton County, from approximately one mile south of the 1-285 South/I-75 exit southward to US 19/41/Tara Boulevard. Total length of this project is 3.53 miles. All work will be done within the existing right-of-way.

Cobb County, GA 2005
Displaying 91 - 100 of 259