Back to top

McIntosh, Paul

Report Number Author(s) Title Abstract Summary County Year
8391 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project IM-OOMS(266), Jackson County

The proposed project would upgrade and reconstruct the interchanges at I-85 and SR 211in Barrow County, I-85 and SR 53, I-85 and 82 Spur, and 1-85 and SR 98 in Jackson County. All proposed work would be done within existing right-of-way.

Bartow 2014
8411 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project BRZLB-71(27), Colquitt County

The proposed project would consist of replacing the Little Creek and Little Creek Overflow bridges along CR 4/Wilbur Murphy Road.

Hart 2014
8422 McIntosh, Paul Archaeological Survey of CR 98/Griffin Road Long County, Georgia

On November 2, 2000, staff archaeologists from the Georgia Department of Transportation conducted an archaeological survey of CR 98/Griffin Road in Long County, Georgia. CR 98/Griffin Road is currently an unimproved dirt road, scheduled for grading, base, drainage and paving.

Lee 2011
8430 McIntosh, Paul, Duff, Eric Anthony Archaeological Survey of a Portion of State Route 88 Washington County, Georgia

On February 15, 2000, staff archaeologists from the Georgia Department of Transportation conducted an archaeological survey a portion of State Route 88 in Washington County, Georgia.

Jefferson 2015
8447 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project STP-0003-00(782), Pierce County

The proposed project would consist of shifting CR 178/Hackelbarney Road approximately 15 feet to the west to improve the intersection alignment at the railroad crossing and intersection with SR 38. Existing right-of-way on CR 178 is approximately 60 feet.

Fulton 2013
8489 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project BRZLB-007(2), Baker County

The proposed project would consist of replacing the bridge spanning Chickasawhatchee Creek along CR 121/Clear Lake Road in Baker County.

Bryan 2015
8504 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project STP-0000-00(847), Gilmer County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-0000-00(847), Gilmer County, has been surveyed with respect to archaeological· resources, especially those on or eligible for inclusion in the National Register of Historic Places

DeKalb 2009
8629 McIntosh, Paul, Duff, Eric Anthony Archaeological Reassessment of Project BHF-012-1(97), Bartow County

The original proposed project would replace the SR 20 bridge over Stamp Creek. The existing bridge is approximately 140' X 26' and would be replaced with an approximately 203' X 44' structure on existing alignment. State Route 20 would be closed, utilizing an off-site detour.

Putnam 2015
8659 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project STP-002-4(30), Bibb and Jones Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-002-4(30), Bibb and Jones Counties, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic P

Chatham 2011
9390 McIntosh, Paul An Archaeological Survey of the Proposed Improvements at the Bacon County Airport Alma, Georgia

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, the proposed improvements to the Bacon County Airport, Alma, Georgia, was surveyed with respect to archaeological resources, especially those on or eligible for inclusion on the National Regis

Bacon 2006
Displaying 121 - 130 of 259