4552
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project CSSTP-0007-00(362), Baldwin County
|
CSSTP-0007-00(362) would consist of upgrading traffic signals at 3 locations in Baldwin County to improve traffic flow. The new traffic signals will be installed at the following intersections: SR 243/S. Wayne Street at W. Andrews Street, SR 243/S.
|
Baldwin
|
2009
|
4612
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project STP-073-2(7), Appling County
|
Project STP-073-2(7) would consist of widening and reconstructing SR 15. The proposed project would begin at CR 531/Red Oak Road and would terminate at CR 417/Hokie Floyd Road. The total length of the project is 2.86 miles. The existing right-of-way is 100 feet.
|
Appling
|
2001
|
4708
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project NHS-0000-00-(932), Bartow County
|
Project NHS-0000-00(932) would replace the existing asphalt ramps with concrete ramps at the 1-75 intersection with US 411/SR 61 in Bartow County. The proposed project would also upgrade the guardrails, turning radii, and acceleration and deceleration lengths.
|
Bartow
|
2002
|
4709
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-179-1(8), Bartow and Polk Counties
|
Project STP-179-1(8) would reconstruct a portion of SR 113 onto new location beginning at CR 36 in Bartow County and terminating at the existing SR 113 in Polk County. This proposed project has been subjected to a previous survey by Teresa Paglione in 1991.
|
Bartow
|
2001
|
4776
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project BRZLB-25(6), Brantley County
|
Project BRZLB-25(6) consists of the replacement of a narrow and substandard bridge on CR 191 over the South Prong of Big Creek in Brantley County, Georgia. This project has been subjected to two previous surveys by Erica Jeter, the first in 1999 and the second in 2001.
|
Brantley
|
2002
|
4831
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-0001-00(076), Bulloch County
|
STP-0001-00(076) would relocate a portion of CR 9/Akins Pond Road in Bulloch County, Georgia. The proposed project would realign the southern terminus of CR 9/Akins Pond Road to provide a 90-degree intersection with SR 26/US 80. The shift would require 80 feet of right-of-way on new location.
|
Bulloch
|
2002
|
4874
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project NHS-0001-00(568), Mitchell County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Mitchell
|
2001
|
4875
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project NHS-0001-00(567), Mitchell County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Mitchell
|
2001
|
4879
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project BRF-081-1(18), Marion County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Marion
|
2000
|
4903
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project CSBRG-0007-00(396), Tattnall County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Tattnall
|
2009
|