Back to top

Lotti, Teresa Ann

Report Number Author(s) Title Abstract Summary County Year
5971 Lotti, Teresa Ann Archaeological Reassessment of Project EDS00-0000-00(346), Baldwin County

Project EDSOO-0000-00(346) would construct the Fall Line Freeway in Baldwin County. This proposed project was subjected to several previous archaeological surveys: January 1986, November 1993, December 1993, July 1996, June 1999, and October 2000 by Southeastern Archeological Services, Inc.

Hall County, GA 2010
5973 Lotti, Teresa Ann Archaeological Assessment of Emergency Repairs at the bridges on CR 280/Lawson Pond Road at the Little River and Little River Overflow, Brooks County

M004115 would repair the scouring at several bents along the CR 280/Lawson Pond Road bridge over tfie Little River Overflow. M004116 would replace the endbent of the CR 280/Lawson Pond Road bridge over the Little River.

Bartow County, GA 1947
5974 Lotti, Teresa Ann Archaeological Reassessment of Project STP-0007-00(149), Douglas County, HPD# HP051024-005

Project STP-0007-00(149) would improve the existing substandard intersection of SR 92/Dallas Highway and Thompson Street at Forrest Avenue in Douglasville, Georgia. This project was originally cleared by Shawn Patch in 2005.

Cherokee County, GA 1947
5975 Lotti, Teresa Ann Archaeological Assessment of Project CSSFT-008-00(215), Effingham County

CSSFT-008-00(215) would consist of adding left turning lanes on both sides of Ninth Street where it intersects with SR 21 in Rincon, Georgia. The proposed project would also add a traffic signal at the Ninth Street/SR 21 intersection.

Cobb County, GA 1947
5984 Lotti, Teresa Ann Archaeological Assessment of and Emergency Repair at the Bridge on SR 5 at Little Wolf Creek, Carroll County

This project would consist of slope repair at Little Wolf Creek on SR 5 in Carroll County, Georgia. The scoured areas around the bridge would be secured with the placement of rip rap around the existing footing of the bridge.

Cherokee County, GA 1977
5986 Lotti, Teresa Ann Archaeological Assessment of an Emergency Repair at the Bridge on Judge Lott Road at th New River, Cook County

M0041 10 would consist of slope and bridge repair at New River on Judge Lott Road in Cook County, Georgia. The approach and end slabs would be replaced at the bridge and the existing replacement might need to be replaced as well.

Gilmer County, GA 1977
6062 Lotti, Teresa Ann Archaeological Assessment of Project CSNHS-M003-00(976), Twiggs, Bleckley, and Laurens Counties

The proposed project would consist of the removal of the outside lanes on 1-16, in both directions, to base repair and replace the lanes with concrete pavement beginning at the 1-16 and SR 96 intersection in Twiggs County and end at the 1-16 and SR 26 intersection in Laurens County.

White County, GA 2010
6064 Lotti, Teresa Ann Archaeological Assessment of Project CSNHS-M003-00(956), Laurens and Treutlen Counties

The proposed project would consist of the removal of the outside lanes on 1-16, in both directions, to base repair and replace the lanes with concrete pavement beginning at the 1-16 and SR 26 intersection in Laurens County and end at the 1-16 and SR 29 intersection in Treutlen County.

Gordon County, GA 2010
6078 Lotti, Teresa Ann Archaeological Assessment of PM# 2511, Quitman County

PM# 2511 consists of the sale of surplus property acquired under project STP-031-1(32) in Quitman County, Georgia. The property is located at the Harrison Street/SR 82 intersection. The parcel is approximately .07 acre in size.

Henry County, GA 2010
6126 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Reassessment of Project BRF-082-1 (15), Murray County

Project BRF-082-1(15) would widen the existing roadway and bridge structure over the L & N Railroad on SR 52 in Murray County. Also, there would be a relocation of Holly Street as it approaches SR 52 from the south.

DeKalb County, GA 2010
Displaying 121 - 130 of 260