Back to top

Lotti, Teresa Ann

Report Number Author(s) Title Abstract Summary County Year
7517 Lotti, Teresa Ann Safe Routes to School along Fletcher and Ferry Lake Roads in Tifton, Georgia

The proposed project consists of pedestrian and bicycle infrastructure improvements along Fletcher and Ferry Lake Roads in Tifton, Georgia. The work on Fletcher Road begins at its intersection with Bill Bowen and terminates at Ferry Lake Road.

Gwinnett 2004
7556 Lotti, Teresa Ann Bridge replacement on SR 120 at Beach Creek in Haralson County, Georgia

The existing right-of-way for SR 120 varies with a maximum of, at least for this part of SR 120, approximately 120 feet wide close to the existing bridge. The project begins at MP 4.36 and end at MP 4.66.

Hancock 1978
7558 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project BR-0000-00(451), Grady County

Project BR-0000-00( 451) would replace the structurally deficient bridge over Little Tired Creek on Pine Park Road/CR 324 in Grady County.

Grady 1998
7578 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project NHS-0001-00(564), Grady and Thomas Counties.

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project NHS-0001-00(564), Grady and Thomas Counties, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Hist

Taylor 1992
7585 Lotti, Teresa Ann Archaeological Reassessment of Project BR-0000-00(451), Grady County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BR-0000-00( 451), Grady County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (N

Grady 1976
8033 Lotti, Teresa Ann Archaeological Assessment of Emergency Slope Repair on SR 62 at Milepost 0.0 (Alabama State Line) in Early County

"In compliance with Section 106 ()f the National Historic Preservation Act of 1966 and amendments thereto, the emergency slope repair on SR 62 in Early· County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Hi

Douglas 1993
8075 Lotti, Teresa Ann Archaeological Reassessment of Project STP00-0054-01(062), Newton County

The proposed project would reconstruct and realign the intersection at Flat Shoals Road/Steele Road and Henderson Mill Road with SR 36. This project was subjected to two previous surveys, once by Erica Jeter in 2000 and again by Luke Erickson in 2004 (HPD #000630-009).

Fulton 2013
8116 Lotti, Teresa Ann Third Addendum for the SR 17/SR 75 Bridge Replacement over the Hiawassee River

The proposed project would replace the structurally deficient bridge on SR 17 /SR 75 over the Hiawassee River, 6.5 miles south of Hiawassee, Georgia.

Coweta 2012
8121 Lotti, Teresa Ann Widening and Reconstruction of US 441/SR 24-New parcel purchase for storm water/erosion control measures

Project EDS00-0441 is widening and reconstructing US 441/SR 24 in Putnam County, Georgia.

Gwinnett 2014
8179 Lotti, Teresa Ann Redesign of the Intersection of SR 1/US 27 Martha Berry Highway and Kay Conley Road in Walker County, Georgia

The proposed project would consist of the redesign of the intersection of SR 1/US 27 /Martha Berry Highway and Kay Conley Road. The project would add right turn lanes on SR 1 for both north and southbound traffic.

DeKalb 2012
Displaying 161 - 170 of 260