6127
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-213 (13), Murray County
|
Project STP-213(13) would construct a new bridge on Federal Road/CR 19 over the CSX railroad in Chatsworth, Georgia. The proposed project would also include a bike lane on Federal Road/CR 19. The existing right-of-way is 80 feet. The required right-of-way varies with a maximum of 150 feet.
|
Fulton
|
2010
|
6171
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-BRF-30-2 (42), Wilcox County
|
STP-BRF-30-2(42) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is approximately 1.30 miles east of Seville, Georgia.
|
Walker
|
2001
|
6172
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-BRF-30-2 (41), Wilcox County
|
STP-BRF-30-2(41) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is located 0.80 mile east of Seville, Georgia. The total length for the project is 3300 feet. The existing right-of-way is 100 feet.
|
Cobb
|
1996
|
6173
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Project STP-BRF-30-2 (41)
|
STP-BRF-30-2(41) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is located 0.80 mile east of Seville, Georgia. The project was subjected to a previous survey by Teresa Lotti in 2001 (HPD# HP010820-007).
|
Walker
|
2001
|
6332
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project CM-575-1(34), Cobb and Cherokee counties
|
Project CM-575-1(34) would install fiber optic cables, traffic surveillance and vehicle detection cameras, and changeable message signs on portions of 1-75 and 1-575.
|
Chattahoochee
|
1993
|
6446
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-0003-00(406), Gwinnett County
|
STP-0003-00(406) would consist of the elimination of the reversible lane system along US 78 from East Park Place Boulevard to SR 124 in Gwinnett County. The proposed project would change the lane configuration to three lanes in each direction with a center concrete median.
|
Glynn
|
1995
|
6447
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project NHS-0001-00(378), Gwinnett County
|
Project NHS-0001-00(378) would consist of constructing a multi-use pedestrian facility, which would include pedestrian ramps and a pedestrian bridge over Ivy Creek, along the west side of SR 20 through the 1-85 Interchange in Gwinnett County.
|
Glynn
|
1995
|
6457
|
Lotti, Teresa Ann
|
Archaeological Reassessment of Project STP-0003-00(46), Gwinnett County
|
None Present.
|
Wayne
|
1999
|
6473
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project NH-038-1(40), Emanuel County
|
Project NH-038-1(40) would widen and reconstruct SR 4/US 1 in Emanuel County, Georgia. The proposed project would begin at the Swainsboro Bypass and terminate 2.04 miles north to the existing segment of SR 4/US 1. The existing right-of-way is 100 feet.
|
Calhoun
|
2011
|
6906
|
Lotti, Teresa Ann
|
Archaeological Reassessment of Project EDS-441 (42), Morgan County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project EDS- 441(42), Morgan County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP
|
Tattnall
|
2003
|