Back to top

Schnitzer, Laura Kate

Report Number Author(s) Title Abstract Summary County Year
8767 Keith, Scot J., Schnitzer, Laura Kate Phase I Archaeological Survey of Fifteen Intersections in Lowndes County Lowndes County, Georgia

New South Associates has completed an archaeological survey of 15 intersections in Lowndes County, Georgia in response to a request from Atkins, North America, Inc.

McDuffie 2007
13526 Schnitzer, Laura Kate Phase I Archaeological Survey of Proposed Bridge Replacement at State Route 59 Over the Hudson River

The Georgia Department of Transportation (GDOT) proposes to replace the Hudson River bridge on SR 59, in Banks County, Georgia (PI No. 0015533). The existing bridge will be dismantled, and a new bridge will be constructed on existing alignment.

Banks 2018
14218 Schnitzer, Laura Kate Phase I Archaeological Survey of the Proposed State Route 90 and Lower Rebecca Road Roundabout Project, Ben Hill County, Georgia; GDOT PI No.: 0013685; HP # 191003-001

AECOM Technical Services, Inc.

Ben Hill 2020
14221 Keith, Scot J., Olin, Susan, Schnitzer, Laura Kate Phase I Archaeological Survey of County Road 927/ Old Highway 46 at Ash Branch, Bulloch County, Georgia

On behalf of the Georgia Department of Transportation (GDOT), New South Associates, Inc. (NSA) conducted a Phase I Archaeological Survey for the proposed replacement of the State Route (SR) 46/County Route (CR) 927 bridge over Ash Branch in Bulloch County, Georgia (GDOT PI No.

Bulloch 2020
14471 Schnitzer, Laura Kate, Gentil, Verna Fourth Addendum to a Phase I Archaeological Survey of the Proposed Widening and Reconstruction of SR92/Dallas Acworth Highway from Old Burnt Hickory Road in Paulding County to US 41/SR 3/Cobb Parkway in Cobb County, Georgia

The projects propose to widen SR 92/Dallas Acworth Highway (Hwy) from Old Burnt Hickory Road (Rd) to US 41/SR 3/Cobb Parkway (Pkwy) from two lanes to a divided four-lane facility with one 11-foot (ft) {3.4 meters [ml) and one 12-ft (3.

Cobb 2021
14539 Schnitzer, Laura Kate Phase I Archaeological Survey for Proposed Signal Upgrades at Twelve Locations along I-75, SR 42 Spur, SR 54, and CS 3279

The Georgia Department of Transportation (GDOT) plans to make improvements to ten intersections along Interstate (I-)75, State Route (SR) 43 Spur, SR 54 (McDonough Boulevard), and CS 3279 in Fulton County, Georgia under GDOT P.I. No. 0013212. New South Associates, Inc.

Fulton 2020
14837 Schnitzer, Laura Kate, Gentil, Verna, Campbell, Elizabeth Chance, Delgado, Alexander Phase I Addemdum Archaeological Survey of Proposed Improvements to State Route 20 from South of County Road 118/Tuck Road to County Street 507/Covington Street, Walton County, Georgia- USACE Section 106 Report (SAS# 2021-00542)

AECOM Technical Services, Inc.

Walton 2021
Displaying 1 - 7 of 7