Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
5381 Joseph, Joseph W., Hamby, Theresa M. Addendum to Phase I Survey of the I-95/CR 138 Horse Stamp Church Road Interchange

No existing or eligible National Register resources were located within the project's area of potential environmental effect.

Washington County, GA 2002
5404 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Oak Road Realignment, Gwinnett County

On June 21, 1993, New South Associates conducted a Phase I archeological survey of the proposed Oak Road realignment project for Post, Buckley, Schuh and Jernigan. A pedestrian survey identified a small prehistoric site within the proposed project corridor.

Chattooga County, GA 1995
5543 Mauldin, Heather, Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Improvements to SR 20, Gwinnett and Walton Counties

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

DeKalb County, GA 1997
5544 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Northern and Sounthern Links of the Northmont-Commerce Connector, Gwinnett County

New South Associates conducted a Phase I archaeological survey of the proposed Northmont-Commerce Connector north and south links on May 28, 1998. The northern link is approximately 1,000 feet long while the southern link is 600 feet in length.

DeKalb County, GA 1990
5549 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Sugarloaf parkway at I-85 and various Interchanges and Improvements to I-85, Gwinnett County

New South Associates conducted a Phase I archeological survey of the roposed Sugarloaf Parkway at 1-85 and various interchanges and improvements to 1-85 from October 21 through October 26, 1992.

DeKalb County, GA 1997
5912 Joseph, Joseph W. Addendum to the Survey of the Lithonia Industrial Boulevard Extension, Dekalb County

This project was conducted in advance of extending Lithonia Industrial Boulevard, on new alignment, from a newly constructed interchange at Interstate 20 (1-20) to Evans Mill Road.

DeKalb County, GA 2010
6073 Joseph, Joseph W. Phase I Archaeological Survey of South LaGrange Loop

A Phase I archaeological survey was conducted in response to proposed changes to the South LaGrange Loop in Troup County, GA. The project entails the addition of a short corridor linking the main road to a property to the west.

Coffee County, GA 2010
6213 Smith, Greg C., Joseph, Joseph W. Phase 1 Archaeological Survey for Bridge Replacement at CR 169/Stagecoach Rd. at Barnett's Creek

The project will replace the narrow and structurally deficient bridge on CR 169/Stagecoach Road over Barnett's Creek with a new reinforced concrete bridge. The project is located in Grady County, approximately 9.4 miles Northeast of Cairo, Georgia, in the 17th Land District, Land Lot No.

McIntosh County, GA 2009
6216 Smith, Greg C., Joseph, Joseph W. Phase I Archaeological Survey for SR 35lUS 319 Intersection Improvements

The project will add a signal and restripe the existing pavement on SR35/US319 at the SR 35 Connector (US 84 11 Bypass), where no signal currently exists. The existing and proposed typical sections include 2-12' lanes in each a direction, a 12' RT turn lane, and a 26' paved median.

Richmond County, GA 2009
6337 Joseph, Joseph W. Phase I Archaeological Survey of the Intersection of Dallas Highway and Barrett Parkway, Cobb County

The project consists of proposed improvements to the intersection of Dallas Highway (SR120) and Ernest Barrett Parkway. A right turn lane would be added to Barrett Parkway southbound.

Fulton County, GA 1979
Displaying 211 - 220 of 297