Back to top

Mustonen, Heather

Report Number Author(s) Title Abstract Summary County Year
4529 Mustonen, Heather Archaeological Assessment of Project STP-0000-00(833), Laurens County

The proposed project would consist of the construction of a new roadway and bridge over the Oconee River north of the city of Dublin in Laurens County. County Road 454/Country Club Road (MP 3.46) would be extended along CR 732Blackshear Ferry Road to CR 8/Ben Hall Lake Drive (MP 0.93).

Laurens 2008
4532 Mustonen, Heather Archaeological Reassessment of Projects BR-003-00(452) and CSSFT-0008-00(400), Walker County

The proposed project would replace two bridges on Happy Valley Road/CR 835 over Chattanooga Creek, 4.20 miles southwest of the City of Rossville, Walker County, Georgia. In addition, the intersection of CR 835/Happy Valley Road and SR 193 would be improved including the installation of a signal.

Walker 2008
4535 Mustonen, Heather Archaeological Assessment of Project STP-0062-01(025), Wilkinson County

The proposed project originally consisted of intersection improvements at State Route 57 and State Route 18 including the realignment and correction of substandard curves on the south, east and west approaches. Approximately 100-200' of right-of-way was required.

Wilkinson 2008
4545 Mustonen, Heather Archaeological Assessment of GDOT Project: Surplus Property Sale, PM # 2247, along Interstate I-75, Catoosa County

The proposed project consists of the identification of surplus property in Catoosa County owned by the Georgia Department of Transportation that will be placed on the market by the Department's Right-of-Way Office.

Catoosa 2008
4550 Mustonen, Heather Archaeological Assessment of Project MSL-0003-00(542), Clayton County

The proposed project would consist of the construction of a new GRTA Xpress Operating Facility on approximately 10 acres of land located in Clayton County.

Clayton 2009
5689 Mustonen, Heather Archaeological Assessment of Project CSBRG-0006-00(469), Fulton County

An archeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Pr

Chatham 1980
5972 Mustonen, Heather Archaeological Assessment of GDOT Emergency Project P.I. No. 0010049, Dekalb County, HP-100907-012

The project is an emergency project that consisted of the repair of a washed out slide area along the westbound side of US 78/SR 10 at Milepoint 7.3 in the vicinity of the exit ramp to SR 236/Hugh Howell Road.

Cherokee 1982
5988 Mustonen, Heather Archaeological Reassessment of GDOT Project CSBRG-0006-00(469), CR581/Bethsaida Rd at Morning Creek Tributary Bridge Replacement in Fulton County; PI0006469; HP #0721217-015

The proposed project consists of replacing the structurally deficient bridge on CR 581/Bethsaida Road over Morning Creek Tributary, 3.4 miles east of Union City, Georgia. The project would construct a new 60' by 48' concrete bridge over Morning Creek Tributary at the existing bridge site.

Oglethorpe 2010
5991 Mustonen, Heather Archaeological Assessment of GDOT Project PM #2298, Surplus Propoert Along US 27/SR 100 in Heard County;PI N/A

The proposed project consists of the transfer of surplus property in Heard County owned by the Georgia Department of Transportation that will be placed on the market by the Department's Right-of-Way Office.

Gwinnett 2010
6017 Mustonen, Heather Archeological Assessment of Project QR#07-01, Coffee County

The proposed project would construct a 12-foot westbound right turn lane on SR 206 Connector at the intersection of SR 31/US 441 north of Douglas.

Floyd 2010
Displaying 31 - 40 of 74