Report Number Author(s) Title Abstract Summary County Year
8942 Mustonen, Heather Atlanta Charter Middle & Neighborhood Charter Schools – Safe Routes to School

The proposed project consists of pedestrian and bicycle improvements in Atlanta, Georgia in the vicinity of Atlanta Charter Middle School and Neighborhood Charter School.

Bryan 2002
9005 Mustonen, Heather Interchange Reconstruction -Interstate 75 at SR 27, Dooly County

The proposed project would replace the existing SR 27 bridge over I-75 on new alignment with a 346-foot long by 71.25-foot wide structure. The proposed typical section of SR 27 would include two 12-foot travel lanes with 4-foot paved shoulders and 6-foot grass shoulders.

Jones 1983
9180 Mustonen, Heather Archaeological Reassessment of GDOT Project CSSTP-0007-00(102), Rockdale County; PI 0007102; HP-090710-001

Site 9R0156 [9RO(DOT)9] was located on April 9, 2010 during an archaeological survey for Georgia Department of Transportation (GDOT) project CSSTP-0007-00(102), PI 0007102 in Rockdale County.

Towns 2002
9181 Mustonen, Heather Archaeological Assesment of GDOT Project CSSTP-0008-00(442), Bryan County; PI No. 0008442; HP-100522-002

An archeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Pre

Coweta 2002
9186 Mustonen, Heather Archaeological Assessment of GDOT Project CSSTP-0007-00(102), Rockdale County; PI 0007102; HP-090710-001

"In compliance with Section 106 of the· National Historic Preservation Act of 1966 and amendments thereto, GDOT Project CSSTP-0007-00(102), Rockdale County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Histori

Rockdale 2009
9195 Mustonen, Heather Archaeological Reevaluation Survey of GDOT Project STP-0007-00(061), Fulton County; PI 0007061; HP-050124-002

The proposed project consists of the widening of SR 120 (Abbotts Bridge Road) a total of 12 feet on the west approach to SR 141 (Medlock Bridge Road) for a distance of approximately 850 feet. This will accommodate two left tum lanes onto Medlock Bridge Road.

Fulton 2009
9200 Mustonen, Heather Archaeological Survey of Project CSSTP-0008-00(397), Bulloch County; PI No. 0008397; HP 080718-005

The proposed project is located at the SR 26/US 80 intersection with Beasley Road/Cawana Road in Statesboro, Georgia. The project consists of intersection improvements and a partial signal upgrade needed to improve turning movements onto SR 26/US 80.

Bulloch 2010
9555 Mustonen, Heather State Route 3 Maintenance from Thomas County Line to Dougherty County Line, Mitchell County, Georgia

The proposed project would consist of milling, patching, resurfacing, striping, raised pavement markers, and-shoulder filling along SR 3 in Mitchell County, Georgia extending from the Thomas County line to the Dougherty County line for a total of 29.224 miles.

Mitchell 2016
9703 Mustonen, Heather US 1/State Route 4 Business Maintenance, Jefferson County, Georgia

The proposed project would consist of maintenance activities along a 2.63 mile section of US 1/SR 4 Business from SR 4 (MP 10.40) to SR 4 (MP 12.63) through Louisville in Jefferson County, Georgia.

Jefferson 2016
9958 Mustonen, Heather SR 95 Alternative Maintenance from SR 41 to SR 74, Meriwether County, Georgia

The proposed project would consist of maintenance activities along a 10.03 mile section of SR 85 Alternate from SR 41 to SR 74 in Meriwether County, Georgia. The proposed activities include milling, patching, resurfacing, striping, raised pavement markers, and shoulder filling.

Meriwether 2016