2429
|
Charles, Joseph
|
Phase I Archaeological Survey at Proposed Bridge Replacement BRST-1802(4), State Route 240 over Buck Creek, Macon County, Georgia
|
On 2 October 2002, Brockington and Associates, Inc., conducted a Phase I archaeological survey for a proposed bridge replacement in Macon County, Georgia (GDOT Project# BRST1802[4]). The area of potential effect (APE) is located on State Route (SR) 240 where the highway crosses Buck Creek.
|
Macon
|
2003
|
2432
|
Charles, Joseph
|
Archaeological Resources Survey at Proposed Bridge Replacement BRST-029-1(46) State Route 49 at Sweetwater and Viney Creek, Sumter and Macon Counties, Georgia
|
On 2 October 2002, Brockington and Associates, Inc. conducted archaeological resources survey for a proposed bridge replacement in Sumter and Macon counties, Georgia.
|
Macon
|
2002
|
2518
|
Charles, Joseph
|
Phase I Archaeological Survey at Proposed Bridge Replacement BRST 2025(5), State Route 329 over Hogcrawl Creek, Macon and Dooly Counties, Georgia
|
On 1 October 2002, Brockington and Associates, Inc., conducted a Phase I archaeological survey for a proposed bridge replacement in Macon and Dooly County, Georgia. This survey was conducted for The LPA Group, Inc.
|
Dooly
|
2003
|
2538
|
Charles, Joseph
|
Phase I Archaeological Survey at Proposed Bridge Replacement BRST-138-1(12), State Route 257 over Ten Mile Creek Pulaski County, Georgia
|
On 30 September 2002, Brockington and Associates, Inc. conducted a Phase I archaeological survey for a proposed bridge replacement in Pulaski County, Georgia (GDOT Project # BRST- 13 81[12]).
|
Pulaski
|
2002
|
2558
|
Jenkins, David, Charles, Joseph
|
Archaeological Testing of Site 9WB24 Webster County, Georgia
|
On 17-21 February 2003, Brockington and Associates, Inc., conducted archaeological testing at site 9WB24 in Webster County, Georgia.
|
Webster
|
2003
|
2758
|
Butler, C. Scott, Charles, Joseph
|
The Ford Plantation Project: Archaeological Data Recovery at Dublin/Richmond Plantation (9BN44, 9BN174, &9BN177) Bryan County, Georgia
|
Proposed development at the Ford Plantation LLC will adversely affect archaeological sites 9BN44, 913N 174, and 913N 177 (Dublin/Richmond Plantation). These sites are located within the Henry Ford National Register of Historic Places (NRHP) District (listed under Criteria B and C).
|
Bryan
|
2003
|
5212
|
Charles, Joseph, Gardner, Jeffrey W.
|
Phase II Investigations at Seven Site on Lake Oliver, Middle Chattahoochee Project (FERC #2177) Lee County Alabama and Muscogee County, Georgia
|
On 7 and 8 August 2001, Brockington and -Associates, Inc., conducted Phase II archaeological testing on selected sites located on Lake Oliver, one of three impoundments that comprise the Middle Chattahoochee Hydroelectric Project (FERC #2177).
|
Camden
|
2002
|
5903
|
Charles, Joseph
|
Cultural Resources Survey of the Proposed US 1 Industrial Park Toombs County, Georgia
|
From 30 January - 6 February 2001, Brockington and Associates, Inc., conducted a cultural resources survey for a proposed industrial park to be located at the intersection of U.S. Highway 1 and State Route (SR) 130, approximately 0.8 km (0.5 mi) north of Lyons, Georgia (Figure 1).
|
Toombs
|
2001
|
6048
|
Charles, Joseph
|
Cultural Resources Survey of Batesville Transmission Line Corridor, Fulton and Cherokee Counties, Georgia
|
In July and September 1999, Brockington and Associates, Inc. conducted a cultural resources survey of proposed Batesville transmission line corridors, located near Batesville, Georgia. The preferred corridor is approximately 4.5 km (2.8 miles) in length and 98 meters (100 ft) in width.
|
Gwinnett
|
2010
|
8608
|
Charles, Joseph
|
CDBG: Street Improvements to Marion Loop & Tish Rd.
|
Based on the information submitted, HPD believes that no historic properties or archaeological resources that are listed in or eligible for listing in the National Register of Historic Places will be affected by this undertaking.
|
Baldwin
|
2015
|